CHAPTER 3: CONVEYOR BELT 

3-7 

 

TURBO HB 

 
9.  Before moving the old belt out of the way, pay particular attention to the way the side wings overlap.  

When  the  belt  is  running  in  the  normal  direction  of  travel,  the  leading  ends  of  the  side  wings  are 
outboard, and the trailing ends are inboard 

 

10.  Place the new belt on the floor beneath the conveyor discharge, being careful to orient it in the same 

direction as the old one that was removed. 

 
11.  If there is not already a hinge pin in the end of the belt, use the pin and rollers that were removed to 

separate  the  old  belt.    There  must  be  a  pin  and  rollers  in  the  extreme  end  of  the  belt  for  ease  of 
insertion. 

 
12.  With  a  person  standing  on  either  side  of  the  belt,  lift  up  the  lead  end  and  start  it  in  the  lower  track, 

from  which  the  old  belt  was  pulled  out.    Be  sure  and  wear  gloves  to  prevent  injury,  and  be  sure  to 
maintain a secure hold on the belt until at least five feet have been fed into the conveyor frame.  At 
this point, the weight of the belt inside the frame should be enough to prevent it running back out on 
it's own. 

 

 
13.  Continue feeding the belt into the conveyor frame.  One person may have to use a pry bar to "help" it 

along from time to time.  Force should not be required.  Many times the belt can be pushed in all the 
way around from the discharge end.  If the belt hangs up, look for some obstruction; don't force it. 

 
14.  When the lead end of the belt reaches the drive shaft, carefully feed it up over the drive sprockets.  
 
15.  Remove the hinge pin and rollers that were used to help guide the belt through the track. 
 
16.  With the ends of the belt engaged in the teeth around the top and bottom of the drive sprockets, the 

two ends should join.  At this point, it may be necessary to remove one or more hinge plates from the 
new belt.  Most new belts are supplied longer than necessary. 

 
17.  Reverse steps 1 through 7. When carrying out step 2 in reverse ensure that the motor is not raised 

too  high  as  to  cause  unnecessary  stress  on  the  chain.  The  chains  should  be  tight  but  there  should 
move together around 5mm when squeezed. Also ensure that all lock nuts are secured before testing. 

Side wings 

Содержание Turbo HB

Страница 1: ...LNS SA CH 2534 Orvin www LNS group com Instruction manual ENG...

Страница 2: ......

Страница 3: ...2 5 2 5 3 Installation safety 2 6 2 5 4 Security analysis for the correct incorporation 2 7 2 6 Installation and startup 2 8 2 6 1 Conveyor Drive 2 8 2 6 2 Leveling 2 8 2 6 3 Connection to the machin...

Страница 4: ...ours 4 2 4 2 Cleaning 4 2 4 3 Factors affecting performance 4 2 CHAPTER 5 OPTIONS 5 1 5 1 Air header 5 2 5 2 Chip stripper bar 5 4 5 3 Spare parts 5 5 5 3 1 Layout of the elements Direct drive version...

Страница 5: ...CHAPTER 1 INTRODUCTION 1 1 TURBO HB CHAPTER 1 INTRODUCTION...

Страница 6: ...here filtration is not required Its simple yet robust construction ensures it offers a long continuous trouble free operation in the most demanding of today s machining environments Combining the late...

Страница 7: ...d responsible for damage and problems arising from the use of options and products other than LNS products or products approved by LNS SA The names of the products indicated in this manual are registe...

Страница 8: ...ed to help in communications with LNS SA regarding size queries and enquiries Drawing dimension Conveyor terminology A Baffle width B Frame height C Baffle height D Frame width E Baffle length F Cover...

Страница 9: ...CHAPTER 2 SETTING INTO OPERATION 2 1 TURBO HB CHAPTER 2 SETTING INTO OPERATION...

Страница 10: ...mages to objects 2 2 Unpacking For practical and safety reasons the conveyor must be unpacked in a spacious well lit location Check to see that the lifting capacity of the hoisting crane or lift truck...

Страница 11: ...or within the operating range of the overhead hoist crane forklift or any other means used for lifting and transportation Lifting points are strategically placed around the conveyor system to allow th...

Страница 12: ...design of conveyor the castors may either be welded to the conveyor or bolted to the conveyor If they are bolted to the conveyor they are normally shipped bolted upside sown to the castor plate for st...

Страница 13: ...ce must ensure that the conveyor cannot run when the machine door is open All safety interlocks on the conveyor or machine must not be over written at anytime The installation of the Hinge conveyor on...

Страница 14: ...ency stop cord around the discharge of the conveyor must be integrated to the machine tools emergency stop circuit where the conveyor and machine are stopped immediately if the cord is pulled labeled...

Страница 15: ...t and assess the need of access and or for the approach Identify sources of risks including failures and failure modes associated with each task Risks can come from o machine in which the device is in...

Страница 16: ...s not equiped with leving castors or jacking screws then it may be necessary to shim the system to make it level When the conveyor is installed to the machine it may be necessary to level the conveyor...

Страница 17: ...ing the installation ensure that the motor is wired in accordance with the supply voltage available The supply voltage of the conveyor is indicated on the electrical drawing supplied in the conveyors...

Страница 18: ...6 6 Electrical control Your conveyor may or may not be supplied with an electrical control depending on the machine and applications requirements If an electrical control is supplied then please see t...

Страница 19: ...CHAPTER 3 CONVEYOR BELT 3 1 TURBO HB CHAPTER 3 CONVEYOR BELT...

Страница 20: ...conveyor belt tension is essential to ensure proper operation and extended life of the conveyor components The belt has been properly tensioned during factory assembly As normal wear occurs the belt m...

Страница 21: ...wings as shown below Check to see that the clutch body is square to the bearing mounting bracket If it is not this will generally indicate which direction the belt is off on side to side tension Once...

Страница 22: ...r turns adjusting belt but clicks at rotation 4 Manually rotate belt back and forth This distributes tension evenly throughout the belt 5 Repeat steps 3 and 4 until belt rotation no longer results in...

Страница 23: ...on the belt tension adjusting screws see drawing below and back off the belt tensioning adjusting screws see drawing below until they are flush with the face of the adjusting bracket 4 Loosen the two...

Страница 24: ...shaft and pull the belt out of the conveyor Be sure to wear gloves to avoid being cut by sharp edges on the belt When only a few feet of belt remain in the conveyor the belt on the floor will have eno...

Страница 25: ...the weight of the belt inside the frame should be enough to prevent it running back out on it s own 13 Continue feeding the belt into the conveyor frame One person may have to use a pry bar to help it...

Страница 26: ...otation without moving the belt On a new belt zero slack is O K but if the belt is difficult to move with the vise grips it s too tight 19 Visually confirm the belt is located in the center of the fra...

Страница 27: ...rrying out any maintenance on the conveyor 3 6 1 Standard and Heavy Duty belts Item No Description 1 Hex head screw 1 Lock washer 1 Tail disc on inside of frame 2 Hinge plate w cleat 3 Hinge plate 4 H...

Страница 28: ...nside of frame 2 Hinge plate w cleat 3 Hinge plate assembly 3 Side wing right hand 3 Side wing left hand 4 Hinge plate w wiper cleat 5 Wiper 6 Washer 7 Hex head screw 8 Link plate 8 Roller link assemb...

Страница 29: ...CHAPTER 4 MAINTENANCE 4 1 TURBO HB CHAPTER 4 MAINTENANCE...

Страница 30: ...isable because particles could become lodged in sensitive areas and impede the proper operation of the conveyor At no time should solvents such as acetone or diluents be used for cleaning the conveyor...

Страница 31: ...CHAPTER 5 OPTIONS 5 1 TURBO HB CHAPTER 5 OPTIONS...

Страница 32: ...r can come in two forms with a solenoid control valve or without The solenoid can be supplied when a timer is used in the conveyor control The solenoid automatically starts the air supply to the air h...

Страница 33: ...elow Air requirement chart m3 hour Belt width mm 102 203 305 406 508 610 762 914 Air pressure Bar 0 7 2 5 4 9 7 1 9 5 10 9 14 8 19 7 23 4 0 8 2 9 5 3 7 8 10 4 12 1 16 1 21 6 25 8 1 0 3 1 5 8 8 7 11 2...

Страница 34: ...bar may or may not be supplied with your conveyor The chip stripper bar is designed to grab long strings of chips from the belt in order to prevent them being carried back down the incline and into th...

Страница 35: ...version Designation Description 1 Motor 2 Motor mounting plate 3 Torque arm bracket 4 Side plate discharge RH right hand 5 Side plate discharge LH left hand 6 Discharge cover 7 Discharge support 8 Dr...

Страница 36: ...end cover 25 Tail disc 26 Tail baffle 27 Baffle RG 28 Baffle LH 29 Top cover load 30 Baffle gusset 31 Track incline RG 32 Top cover incline 33 Drive cover Please note that the appearance of the convey...

Страница 37: ...CHAPTER 6 APPENDICES 6 1 TURBO HB CHAPTER 6 APPENDICES Appendix A Ordering form A 2 Appendix B Address LNS A 3...

Страница 38: ...e photocopied duly filled out and returned to your retailer or nearest LNS SA agent Company name Person in charge Address ZIP City Country Phone Fax Type of device Serial number Qty Ordering no Descri...

Страница 39: ...TURBO UK Waterside Park Valley Way Wombwell GB Barnsley S73 0BB sales Lnsturbouk com www Lns europe com TEL 44 1226 27 00 33 FAX 44 1226 27 00 44 ITALIA LNS AUTOMAZIONE S R L Via Mons Colombo 34 IT 21...

Отзывы: