![LNS Turbo HB Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/lns/turbo-hb/turbo-hb_instruction-manual_1932284017.webp)
CHAPTER 2: SETTING INTO OPERATION
2-9
TURBO HB
2.6.4. Electrical connection
Particular attention should be given to the handling of electrical elements because of risks
of electrocution. In case of possible electrical malfunctions, it is advisable to contact LNS or
their local representative.
It is strictly prohibited to make adjustments as long as the conveyor is under electrical
power. The adjustments of the electrical equipment must only be performed by qualified
personnel in line with local regulations.
During the installation, ensure that the motor is wired in accordance with the supply voltage available. The
supply voltage of the conveyor is indicated on the electrical drawing supplied in the conveyors control
panel. If no control panel is supplied then the voltage can be checked directly at the conveyor motor
terminal box as shown below in section 2.6.5. and 2.6.6. respectively. Even if the electrical drawing is
correct to the machines requirements the conveyor motor should be checked to ensure the voltage
setting is correct to prevent possible damage.
Designation
Description
1
Motor terminal box
2
Cable from control box to motor
3
Cable from control box to be connected to the machine
4
Control box
1
2
3
4
Содержание Turbo HB
Страница 1: ...LNS SA CH 2534 Orvin www LNS group com Instruction manual ENG...
Страница 2: ......
Страница 5: ...CHAPTER 1 INTRODUCTION 1 1 TURBO HB CHAPTER 1 INTRODUCTION...
Страница 9: ...CHAPTER 2 SETTING INTO OPERATION 2 1 TURBO HB CHAPTER 2 SETTING INTO OPERATION...
Страница 19: ...CHAPTER 3 CONVEYOR BELT 3 1 TURBO HB CHAPTER 3 CONVEYOR BELT...
Страница 29: ...CHAPTER 4 MAINTENANCE 4 1 TURBO HB CHAPTER 4 MAINTENANCE...
Страница 31: ...CHAPTER 5 OPTIONS 5 1 TURBO HB CHAPTER 5 OPTIONS...
Страница 37: ...CHAPTER 6 APPENDICES 6 1 TURBO HB CHAPTER 6 APPENDICES Appendix A Ordering form A 2 Appendix B Address LNS A 3...