![LMI ROYTRONIC A Series Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/lmi/roytronic-a-series/roytronic-a-series_instruction-manual_1932175008.webp)
2
Instruction Manual
SECTION 1 - INTRODUCTION
1.2 UNPACKING CHECK LIST
Your carton will contain many or all of the following
items. Please notify the carrier immediately if there
are any signs of damage to the pump or its parts.
Metering Pump
Ceramic Foot Valve
Weight
Low - Level Sensor
(Optional)
External Control
Cable (Optional)
Tube Connection
Hardware
Injection Check
Valve
Four - Function Valve
(Optional)
Foot Valve
Tubing (0 to 3 Rolls)
Figure 1. Unpacking Check List