Octagon Greenhouse Manual
Construction Manual © 2011 Little Cottage Co. Page 10
55
56
57
58
59
60
Next install last 2 rafters.
Install rafters as shown.
Secure bottom of rafters on top plate
before doing the top.
Secure rafter with 2 1/2” screws.
After all rafters are installed and fas-
tened, fill in blocks that are cut on
angles in between rafters.
Secure blocks with 2 1/2” screws as
shown.