Octagon Greenhouse Manual
Construction Manual © 2011 Little Cottage Co. Page 8
43
44
45
46
47
48
Locate 2x6 top plate with trim attached.
Install top plates as shown. Keep flush
on the inside and make sure corners
line up. Secure with 2 1/2” screws.
Continue with top plates as shown.
Insert 2 1/2” screws in an angle to tie top
plates together.
Next locate all the rafters and roof
parts.
Install first rafter to Octagon as shown
at pencil marked as shown.