background image

Octagon Greenhouse Manual 

Construction Manual              © 2011 Little Cottage Co.                       Page 15

85

86

87

88

89

90

Place treated shelves on inside as 

shown.

Place treated shelves on inside as 

shown.

Next start installing shelves at corner as 

shown. Keep flush with top of window 

sill and secure with 2 1/2” screws. Deck 

screws are provided for treated shelves.

Continue with shelf installation.

Continue installing shelves on 7 walls.

To tie shelves together insert 2 1/2” deck 

screw as shown.

Содержание Octagon Greenhouse

Страница 1: ...330 893 4212 www cottagekits com 2011 Little Cottage Co Octagon Greenhouse Manual Tools Needed Cordless Drill 12V or higher 2 Square Drive Bit Hammer 6 Step Ladder Tape Measure Utility knife w blade...

Страница 2: ...n Green house Layout 4x4 s as shown Next locate the 8 pieces of rim and joist Here you see the 8 pieces of rim The rims are numbered as shown Make sure matching numbers are connected Continue with rim...

Страница 3: ...ked off where the joist need to go Secure joist with 2 1 2 Zinc screws Next check floor framing for square as shown Next place floor on top of 4x4 s as shown The 2 longest 4x4 s need to be in the cent...

Страница 4: ...Screws Next measure floor for square as shown Once floor is square secure all the joist to the 4x4 runners as shown Angle 2 1 2 screws thru joist into 4x4 runner One on each side Next locate 5 8 plywo...

Страница 5: ...oor Secure 1 1 4 screw every 8 to 10 Securing the last piece of flooring Next locate wall panels Start with panel A and continue thru panel H Secure wall panel A with 2 1 2 screws as shown make sure c...

Страница 6: ...Cottage Co Page 5 25 26 27 28 29 30 Continue with walls Secure all corners with 2 1 2 Zinc Screws Continue with walls Make sure the inside corner is in place and secure with 2 1 2 Zinc screws as shown...

Страница 7: ...and install Install barrel bolt Secure with 1 1 4 screws Use ham mer and tap on top of bolt as shown to locate hole to drill Use 3 16 bit and drill hole in bottom of door as shown Barrel bolt is inst...

Страница 8: ...38 39 40 41 42 Install door latch as shown Use 1 1 4 black headed screws to secure door latch Next secure D lever on inside Secure D lever with 1 1 4 black headed screws Install L bracket to keep door...

Страница 9: ...im attached Install top plates as shown Keep flush on the inside and make sure corners line up Secure with 2 1 2 screws Continue with top plates as shown Insert 2 1 2 screws in an angle to tie top pla...

Страница 10: ...install second rafter and repeat Now partial rafter is ready to install have 2 guys pickup the rafter as shown and set on top of building Secure rafter to top plate and make sure corners of rafters l...

Страница 11: ...60 Next install last 2 rafters Install rafters as shown Secure bottom of rafters on top plate before doing the top Secure rafter with 2 1 2 screws After all rafters are installed and fas tened fill i...

Страница 12: ...with rafter blocks Halfway down from the top you will in stall 2x3 s in between rafters as shown and secure with 2 1 2 screws Continue installing 2x3 rafters Next locate metal roof corners and sunsky...

Страница 13: ...e Cottage Co Page 12 67 68 69 70 71 72 Metal corners are marked underneath bottom so you need to make sure they are on the bottom Secure with 3 1 1 4 screws per side Metal corner installed Metal corne...

Страница 14: ...l 2011 Little Cottage Co Page 13 73 74 75 76 77 78 Roof will overhang trim roughly 1 Secure with 1 white screws with rub ber washer Install second piece as shown and repeat 1 overhang insert screws be...

Страница 15: ...ttage Co Page 14 79 80 81 82 83 84 Locate outside corners Next place corners as shown Once corner in place Secure with 1 1 4 Zinc screws rough ly 10 to 12 apart Secure all corners and bottom edge of s...

Страница 16: ...own Place treated shelves on inside as shown Next start installing shelves at corner as shown Keep flush with top of window sill and secure with 2 1 2 screws Deck screws are provided for treated shelv...

Страница 17: ...6 91 92 93 94 95 96 The short braces will be installed on end shelves Make sure all tops are flush before fastening Next install brace as shown If wood wants to split use 1 8 drill bit and drill hole...

Страница 18: ...Octagon Greenhouse Manual Construction Manual 2011 Little Cottage Co Page 17 97 8x8 Octagon greenhouse is complete...

Отзывы: