Main switch

The main switch (red key) is located inside the platform, behind the cover (

p.7, item 

4

). The  key  can  be  removed  by  turning  it  anti-clockwise,  thus  disconnecting  the 

power supply. (For opening the cover, sees 4.7.1). The main switch must be actuated 
by technical personnel.

Deep discharge protector and charging

The LL12 platform lifts are equipped with automatic battery chargers. Charging takes 
place automatically when the platform lift drives into a loading station. The batteries 
do not require any care.
All LL12 platform lifts are equipped with an acoustic deep discharge protector. This 
acoustic signal generator is intended to protect the batteries against deep discharge.
If  the  battery  voltage  drops  below  22  V,  a  beep  sounds  at  intervals  of  approx.  5 
seconds. In this case you should drive immediately to the next charging station – if 
possible the lower charging station – and allow the lift to charge up there for several 
hours  (this  takes  place  automatically  in  the  charging  station). The  beep  stops  after 
proper charging. The sound can be turned off by pressing the emergency stop button; 
this has no influence on the charging process.

Checking the loading / overload protection

The LL12 platform lift is equipped with an overload protector (acoustic and visual).
On activation the orange lamp on the hood goes out (

p.7, item L2

). In addition, the 

internal beeper emits a continuous tone in the case of overload. This is based on the 
entire load being in the centre of the base of the platform. Reduce the weight if the 
overload protector is  triggered. It may be sufficient just to shift the weight towards 
the running rail.

Battery charger 

(indicator lamps)

The  indicator  lamps  on  the  battery  charger  indicate  the  respective  condition  of  the 
battery charger. Distinction  must  be made between different versions of the battery 
charger.  
The  meaning  of  the  various  colours  or  indicator  lamps  is  shown  on  the  battery 
chargers.  The  installer  will  explain  this  to  you  in  detail  once  again  during  the 
instruction.

Note: An acoustic signal sounds if the lift, outside a station, is not charged 30 

seconds after the last motor movement.

Содержание LL12

Страница 1: ...r 10 4 5 Fetching and sending the platform lift 11 4 5 1 Folding procedure 12 4 6 Travelling with the platform lift 13 4 7 What to do in the event of an unexpected standstill 13 4 7 1 Hand wheel opera...

Страница 2: ...ing additional directives EMC directive 2014 30 EU Low voltage directive 2006 95 EC The following harmonised standards were applied or their protective goals were attained EN 81 40 2009 EN 349 2008 EN...

Страница 3: ...d weight of the platform Load carrying capacity of the platform Serial number Year of manufacture Type designation Type of machine General The rating plate provides the most important information abou...

Страница 4: ...surfaces item 2 green is activated the platform stops moving and an acoustic warning signal is activated After two seconds the platform drives without any command for 1 5 seconds in the opposite dire...

Страница 5: ...ecked and adhered to In Germany a test is obligatory for systems with a lifting height of 3 m In each case proof must be provided and documented in accordance with EN81 40 before the first use The LL1...

Страница 6: ...le and that the permissible loading capacity is not exceeded Loads that protrude beyond the surface area of the opened base may in general not be transported e g large pieces of furniture The LL12 pla...

Страница 7: ...Left hand safety barrier 9 Cover for motor controller front cladding 9 1 Folding seat option 10 Left hand drive on ramp 11 Contact base 12 Lateral drive on ramp option 13 Plug seal 14 charging fuse L...

Страница 8: ...near to the running rail and the platform when the lift is moving Residual danger trapping of loose clothing etc Fold up the lift when not in use Residual danger tripping over Never place your hands...

Страница 9: ...any unnecessary movements on the platform such as rocking or swinging Residual danger falling from the platform Remove dirt from the lift with a little polish or a damp cloth not with a water jet The...

Страница 10: ...ral hours this takes place automatically in the charging station The beep stops after proper charging The sound can be turned off by pressing the emergency stop button this has no influence on the cha...

Страница 11: ...ng renew the batteries at your earliest convenience RED the battery power is very low replace the batteries immediately Fetching and sending the platform lift special version 1 via the external contro...

Страница 12: ...ding procedure is complete If a malfunction should occur during the folding procedure the platform must be folded up or opened manually see below and customer service must be informed The folding proc...

Страница 13: ...for a trip with the platform open via the external control unit This option must be activated by a specialist inside the controller It must be ensured that no third person can suddenly get jump into t...

Страница 14: ...irection of travel should always be towards the lower station less energy expenditure when turning the hand wheel The respective direction of rotation is indicated directly on the hand wheel Note If t...

Страница 15: ...utton p 7 item 3 on the platform Remove the plug seal for the emergency unlocking on the front cladding on the uphill side using a screwdriver or similar Press the lever shown in the picture below rig...

Страница 16: ...hese cases an additional drive on ramp is to be mounted on the long side of the platform p 7 item 12 Folding seat All of our platform lifts can be equipped or retrofitted with a folding seat if desire...

Страница 17: ...e all key switches at 0 except at the control station selected by you Set the key switches correctly see 4 5 or 4 6 In the case of radio controlled control stations are the batteries OK Replace the tr...

Страница 18: ...1 6 01 2017 8 Services performed on your Konstanz stair lift at a glance Installed on Serial no Installed by T V acceptance on No Date Service performed Signature 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15...

Отзывы: