background image

 

 

The clamps and installation methods in the table 8 are recommended to match the 72 cells 
glazed glass bifacial modules

 

manufactured by Linyang Photovoltaic(In table 7) .

 

Tab 7  Types of modules

 

5BB modules(glazed glass)  5BB half cut modules(glazed glass)  MBB modules(glazed glass) 

BP72 

 

MP72 

BP72P 

 

MP72H 

Tab 8: Clamps and installation

 

No 

Overlapping 
size 

Recommended supplier 

Clamps type and 
length 

Quantity and 
site 

Maximum load 

fastener 

 

8-A1 

 
 
 

15mm

front

 

17.5mm 
(contrary) 

 
 
Jiangyin 
Haida New 
Energy 
Materials 
Co.Ltd

 

 

 

 
HD-005V

end clamp

 

HD-005W(middle clamp) 
length =150mm 

 
4 clamps 
A=420±20mm 
Fig A 

 
Downward≤2400pa 
Upward≤2400pa 

 

 

Inside 
hexagonal 
bolt + 
spring

 

 

8-A2

 

 
HD-005V

end clamp

 

HD-005W(middle clamp) 
length =150mm

 

 
6 clamps 
A=260±20mm 
Fig B

  

 
Downward≤5400pa 
Upward≤2400pa

 

  
 

8-B1 

 
 
 

14.5mm

front

 

14.5mm

contrary

 

 

  
 

Jiangyin 
Haida New 
Energy 
Materials 
Co.Ltd

 

 

 

 
HD-008V

end clamp

 

HD-008W(middle clamp) 
length=150mm 

 
4 clamps 
A=420±20mm 
Fig A 

 
Downward≤2400pa 
Upward≤2400pa 

 
 
Inside 
hexagonal 
bolt + 
spring 

  
 

8-B2 

 
HD-008V

end clamp

 

HD-008W(middle clamp) 
length =150mm 

 
6 clamps 
A=260±20mm 
Fig B

  

 
Downward≤5400pa 
Upward≤2400pa

 

  
 

8-C1 

 

 
 
 

11mm 

front

 

14.5mm 
(contrary) 

 

 
 

Schlette 
(shanghai)  
Solar 
Technology 
co.,Ltd  

 
 

 
 

 

 

132002-004

end 

 

132001-002(middle) 
length =150mm 

 
4 clamps 
A=420±20mm 
Fig A 

 
Downward≤2400pa 
Upward≤2400pa 

 

 

 

Hexagon 

socket 

taper bolt 

 

  
 

8-C2 

 

 

132002-004

end

 

132001-002(middle) 
length =150mm 

 
6 clamps 
A=260±20mm 
Fig B

  

 
Downward≤5400pa 
Upward≤2400pa

 

 
 

8-D1 

 

 

 
 
14mm 

front

 

14mm 
(contrary) 

 
 

 
 

Shanghai 
Chiko  
Colar 
Technology 
co.,Ltd

 

 

 

CK-406-150

end

 

CK-455-150

middle

 

length =150mm 

 
4 clamps 
A=420±20mm 
Fig A 

 
Downward≤2400pa 
Upward≤2400pa 

 
 

 

Inside 
hexagonal 
bolt

 

 
 

8-D2 

 

 

CK-406-150

end

 

CK-455-150

middle

 

length =150mm 

 
6 clamps 
A=260±20mm 
Fig B

  

 
Downward≤5400pa 
Upward≤2400pa

 

 
 

8-E1 
 

 
 
 
13mm 

front

 

13mm 
(contrary) 

 
 

JiangSu 
Akcome 
science  & 
Technology 
Co.Ltd. 

 

 

 

AG0790A0-34

end

 

AG0790A0-35

middle

 

length =150mm 

 
4 clamps 
A=420±20mm 
Fig A 

 
Downward≤2400pa 
Upward≤2400pa 

 
 
 

Inside 
hexagonal 
bolt 

 

8-E2

 

AG0790A0-34

end

 

AG0790A0-35

middle

 

length =150mm 

 
6 clamps 
A=260±20mm 
Fig B

 

 
Downward≤5400pa 
Upward≤2400pa 

 

Содержание BP60T

Страница 1: ...PV MODULE INSTALLATION MANUAL Jiangsu Linyang Photovoltaic Technology Co Ltd No 612 Huashi Rd Qidong Jiangsu 226200 ...

Страница 2: ...election of angle of inclination 5 5 3 Mode of installation 6 5 3 1 Frameless solar PV module installation 6 5 3 2 Frame solar PV moudue installation 12 5 4 Installation requirements 14 6 Electrical Installation 15 6 1 Wiring and connection 15 6 2 PV module connector 15 6 3 Use appropriate components 15 6 4 Diodes 16 6 5 Cable protection 16 7 Grounding 16 8 Cleaning and Maintenance 17 Version No 1...

Страница 3: ...ior notice Linyang Photovoltaic holds no liability for any damage or hurt whatsoever including but not limited to any personal injury hurt or property arising from any module operation system installation or compliance or non compliance with any instruction herein A client s failure in observing instructions listed herein during any module installation will result in expiry of the limited warranty...

Страница 4: ... the parameters of other components in the PV generation system related to the module power output such as rated voltage conductor capacity fuse capacity and controller capacity design and install such components based on 125 of the values of short circuit current and open circuit voltage labeled on the module e To reduce hazards of electric shock or combustion opaque materials may be applied to c...

Страница 5: ...les b Do NOT install modules under rain snow or windy conditions c Do NOT wear metallic jewelry which can cause electric shock during installation d In case of ground installation choose an appropriate installation height to avoid long time snow cover on the upper half of module in winter in snow weather e Ensure smooth ventilation at the back of module the recommended minimal clearance between th...

Страница 6: ... shall be soaked in water pure water or salt water or touch water for long time e g fountain or spray 5 2 2 Geographical conditions Solar modules shall be installed at locations where modules receive most illumination throughout the year In the northern hemisphere a module should preferably face the south while in the southern hemisphere a module should preferably face the north When choosing a lo...

Страница 7: ...ineer The installation design and process shall conform to local electrical and building norms and codes At a minimum each module shall be tightened by 4 points on both long sides Linyang Photovoltaic suggests that the minimal width of supporting pole should be 40mm 1600Pa 1600Pa load requirement 1 5 safety factor System designers and installers shall be responsible for the load calculation and th...

Страница 8: ...le below is for beamless installation of the module maximum load downward 5400pa upward 2400pa Installed with Beams The clamps and installation methods in the table 2 are recommended to match the 60 cells transparent glass bifacial modules manufactured by Linyang Photovoltaic In table 1 Tab 1 Types of modules 5BB modules 5BB half cut modules MBB modules BP60T QP60T MP60T BP60TL QP60TP MP60TL BP60T...

Страница 9: ...pa Upward 2400pa 2 C1 14mm front 14mm contrary Shanghai Chiko Solar Technology co Ltd CK 406 150 end CK 455 150 middle length 150mm 4 clamps A 350 20mm Fig A Downward 2400pa Upward 2400pa Inside hexagonal bolt 2 C2 CK 406 100 end CK 455 100 middle length 100mm 6 clamps A 210 20mm Fig B Downward 5400pa Upward 2400pa 2 D1 13mm front 13mm contrary JiangSu Akcome science Technology Co Ltd AG0790A0 34 ...

Страница 10: ... Fig B Downward 5400pa Upward 2400pa 4 C1 11mm front 14 5mm contrary Schlette shanghai Solar Technology co Ltd 132002 004 end 132001 002 middle length 150mm 4 clamps A 350 20mm Fig A Downward 2400pa Upward 2400pa Hexagon socket taper bolt 4 C2 132002 004 end 132001 002 middle length 100mm 6 clamps A 210 20mm Fig B Downward 5400pa Upward 2400pa 4 D1 14mm front 14mm contrary Shanghai Chiko Colar Tec...

Страница 11: ...2400pa 6 B1 11mm front 14 5mm contrary Schlette shanghai Solar Technology co Ltd 132002 004 end 132001 002 middle length 150mm 4 clamps A 420 20mm Fig A Downward 2400pa Upward 2400pa Hexagon socket taper bolt 6 B2 132002 004 end 132001 002 middle length 150mm 6 clamps A 260 20mm Fig B Downward 5400pa Upward 2400pa 6 C1 14mm front 14mm contrary Shanghai Chiko Colar Technology co Ltd CK 406 150 end ...

Страница 12: ...0 20mm Fig A Downward 2400pa Upward 2400pa Inside hexagonal bolt spring 8 B2 HD 008V end clamp HD 008W middle clamp length 150mm 6 clamps A 260 20mm Fig B Downward 5400pa Upward 2400pa 8 C1 11mm front 14 5mm contrary Schlette shanghai Solar Technology co Ltd 132002 004 end 132001 002 middle length 150mm 4 clamps A 420 20mm Fig A Downward 2400pa Upward 2400pa Hexagon socket taper bolt 8 C2 132002 0...

Страница 13: ...les service and obtain Lin Yang to agree otherwise the warranty will expire The minimum spacing between the two moduls is 10mm The drain hole shall not be blocked under any circumstances during installation or use Maximum load downward 5400pa upward 5400pa The following table shows the types of Lin Yang 72cells framed bifacial and double glass modules 5BB modules 5BB half cut modules MBB modules M...

Страница 14: ... using bolts washer spring washer and nut and tighten to 16 20N M torque 5 3 2 2 Installation of pressing block clamping The fixture must have an overlap of at least 7mm to 10mm with the module frame mounting width Use at least 4 clamps to attach the module to the mounting bracket How many clamps to use depends on the local wind and snow pressure intensity If the pressure exceeds the expected esti...

Страница 15: ...del Connect an appropriate quantity of modules according to the voltage specification of inverter applied in the system Even under the worst local temperature conditions the voltage of connected modules shall not surpass the voltage value allowed by the system If no over current protective device fuse is not used in series connection in each module series at most two module series may be connected...

Страница 16: ...ntity of modules in each series depends on the system design inverter type and environment conditions The maximum rated fuse current value of each module series is marked on the product tag and in the specification and parameter list The rated fuse current corresponds to the highest reverse current value that the module can withstand Please apply appropriate fuses to protect the modules in series ...

Страница 17: ...n fixing a junction box conductor to the bracket the bending radius of conductor shall not be less than 60mm and the rated current shall exceed 10A Special Caution The temperature ceiling of cable is 85 C 7 Grounding Equipment grounding There is no exposed conductor in the frameless double glass PV module thus grounding is not required in accordance with NEC codes The framed modules need to be gro...

Страница 18: ...ion of module is not less than 5 degrees normal rainfall under most weather conditions is sufficient to keep the module glass surface clean In case of excessive dust accumulation soft cloth and water will suffice to clean the glass surface Never use any cleaning agent containing acid or alkali to clean any module In case of accumulated snow use a soft hair brush to clean the module surface It is s...

Отзывы: