Take the following measures when clamps are applied to install a module:
(1) Do not bend the module;
(2) No installation component covers any solar cell;
(3) Do not scratch any module glass surface;
(4) Ensure that the overlapping width of module and clamp
(
including the top and bottom
)
is
equal or greater than 11mm;
(5) Ensure that the minimum thickness of clamp is 1.5 mm.
5.3.2 Frame solar PV moudue installation
Install the moduls according to the following examples and recommendations, if the way of
installation is different from linyang company, please consult Lin Yang for technical support and
after-sales service
,
and obtain Lin Yang to agree
,
otherwise, the warranty will expire.
The minimum spacing between the two moduls is 10mm
。
The drain hole shall not be blocked under any circumstances during installation or use.
Maximum load
:
downward
≤
5400pa
,
upward
≤
5400pa
。
The following table shows the types of Lin Yang 72cells framed bifacial and double-glass
modules
:
5BB modules
5BB half cut modules
MBB modules
MBB glazed glass modules
BP72TF
BP72F
MP72TF
MP72F
BP72TPF
BP72PF
MP72TFL
MP72FL
BP72TFL
BP72FL
MP72HTF
MP72HF
BP72TPFL
BP72PFL
MP72HTFL
MP72HFL
The installation mode is divided into two types: installation of mounting hole and installation
of pressing block
5.3.2.1
Installation of mounting hole
Fix the modul on the rail with bolts through the mounting hole on the back frame of the
module:
Fig 1