background image

1

1  |  Document Content

1.1 Function 

This operating instructions manual provides necessary information on 
installation, commissioning, safe operation, disassembly and disposal.

1.2 Target group: Authorised personnel

All operations described in this operating instructions manual may only 
be performed by trained professional staff authorised by the operator.
Only install and commission the SmartLINK if you have read and un-
derstood the operating instructions manual and are familiar with the 
applicable regulations.

1.3 Symbols and abbreviations used

 

Information, tip, note: 

 

This symbol highlights helpful additional information

     

Caution: 

     

Failure to comply with this warning can lead to disorders &   

 malfunctions.

     

Warning:     

 

Failure to comply with this warning can damage the 

 SmartLINK.

Power supply 

= PWR

Supply channel 

= CHL

Extension/additional modules  = EXT
Input 

= IN

Output 

= OUT

White 

= WH

Yellow 

= YE

Brown 

= BN

Red 

= RD

Blue 

= BL

Green 

= GN

Switch-on time 

= ED

i

!

!

2

1.4 Proper Use

The products described here have been developed in order to ensure 
functions as part of an overall system. It is the responsibility of the in-
staller to ensure the correct overall functioning.
It may be used only in accordance with the following versions or for 
applications approved by the installer. Detailed information on the ap-
plication range can be found in the chapter „Product description“.

1.5 General notes on safety

The safety notes of the operating instructions manual and the country-
specific installation-, safety- and accident prevention regulations are 
to be followed.
Residual risks are not known when observing the notes on safety and 
the instructions relating to the installation, commissioning, operation 
and maintenance.

1.6 Warning of misuse

In case of inappropriate or improper use or tampering, mal-
functions as well as risks, e.g. due to missing signal trans-
mission, can arise for people due to the use of the SmartLINK 

cable transfer. Please follow the applicable standards / guidelines (DIN 
EN, VdS) in this respect.

1.7 Disclaimer

For damages or malfunctions caused by incorrect installation or failu-
re to comply with this instruction manual, no liability is assumed. For 
damages resulting from the use of spare parts or accessories not ap-
proved by the manufacturer, any further liability of the manufacturer is 
excluded.
Any unauthorised repairs, modifications and additions are not permit-
ted for reasons of safety and exclude any liability of the manufacturer 
for damages resulting from this.

Содержание SmartLINK M 13 25

Страница 1: ...Operation and Installation Manual SmartLINK M 13 x...

Страница 2: ...n 3 2 1 Type code 3 2 2 Terms and conditions and use 3 2 3 Technical data 3 3 Assembly 5 3 1 General notes on assembly 5 3 2 General notes on electrical connection 10 4 Commissioning and Maintenance 1...

Страница 3: ...l functioning It may be used only in accordance with the following versions or for applications approved by the installer Detailed information on the ap plication range can be found in the chapter Pro...

Страница 4: ...and its construction the domestic and commercial doors can be completely manufactured in the workshop tested as an assembly and accepted in the object immediately after installation 2 3 Technical dat...

Страница 5: ...everal dimensions Please check the place of installation and the space available in the rabbet and profile area before the beginning of assembly Place of assembly Door rabbet Minimum installation dept...

Страница 6: ...frame leaf Mill recess for lock plates radius 10 mm 3 mm deep Mill recess of 19 mm width and 268 mm length 28 mm deep Drill holes for cable exit 16 mm 20 19 268 8 16 280 300 3 28 268 280 8 16 3 28 Fl...

Страница 7: ...2 General notes on electrical connection The electrical connection may only be done in de energised state and by authorised personnel For connection examples see attachment 10 20 268 16 280 50 268 28...

Страница 8: ...onal test is undertaken with the following steps Check SmartLINK for tightness Check lead spring and housing for damage It is recommended to clean exposed parts at least once per year with a soft dry...

Страница 9: ...ut switching valid for the inputs IN1 8 Master Slave 1 Note The correct polarity of the inputs must be ensured The input switching can be freely selected for each input IN 1 8 Input switching 2 Loop t...

Страница 10: ...15 8 1 EC Declaration of Conformity 8 Declaration of Conformity 16...

Страница 11: ...LINK GmbH D 35510 Butzbach Telephon 49 0 6033 97404 0 Fax 49 0 6033 97404 20 E Mail info link gmbh com Internet www link gmbh com Specifications subject to change without notice MA0002062 Stand 4416...

Отзывы: