RHR-CF
Installation instructions
1. Contents
1. Contents ....................................................................
.
.....
2
1.1 Content
s
2
2 .
Safety ........................................................................
..
...
3
2.1
Essential
safety
rul
es
3
2.2
Safe
ty requirements
3
2.3
Symbols
3
3.1
Use and storage of the manual
4
3
.
2
Scope
4
3.3
Machine identification
4
4.1
Waste disposal
4
lindab | we simplify construction
3 .
Manual ................................................................
.
........
.
..
4
4. End of use ...................................
.
............................
.
.
...
.
4
Lindab reserves the right to make changes without prior notice
20
22-01-28
5
.
Range
.......
...............................................................
.
....
.
..
5
6
.
Dimensions
.
..............................................................
.
.
.
...
7
6
.1
Machine dimensions with packaging
9
7
.
Technical data/ energy
.
...........................................
.
..
..
.
10
7
.1
Technical data/ energy -
RHR-CF-V
10
7
.
2
Technical data/ energy -
RHR-CF-V PRO
1
1
7
.
3
Technical data/ energy -
RHR-CF-V PRO M
1
2
8
.
Description of machine components
......................
.
...
..
.
1
3
9
.
Installation
................
...........................................
...
.
......
..
.
1
4
9
.1
Installation instructions
1
4
9
.
2
Wall installation of appliance
14
9
.
3
Positioning the appliance
1
5
9
.
4
Condensate drain connection
1
6
9
.
5
Floor
installation of appliance
1
6
10
.
Electrical connections
................
...........
..
.........
...
.
...
.
..
.
..
1
7
10
.1
Power board
17
10
.
2
Dip switch configuration
19
10
.
3
Connection with remote control
2
0
1
1
.
Controller
....................
................
...........
..
.........
...
.
...
.
.
..
..
2
1
1
1
.1
Installing controller on
the
wall
2
1
1
1
.
2
T-EP touch controller
2
2
1
1
.
3
Description of the controller
2
3
1
2
.
Commissioning
................
...........
..
.........
...
..........
.
...
.
...
..
.
2
4
1
3
.
Humidity sensor
................
...........
..
.........
...
..........
...
.
..
..
..
2
6
1
3
.1
Moving the humidity sensor for unit
PRO
2
6
1
4
.
Condensate drain connection
.
....
..
.........
...
..........
...
.
..
.
.
2
7
1
4
.1
Setting the flow rates
2
7
1
4
.
2
Standard calibration- left side configuration
2
7
1
4
.
3
Right side configuration
29
1
4
.
4
Automatic calibration
3
1
1
5
.
Setting of the weekly programme
.
....
..
........
........
...
.
.
.
..
3
2
1
5
.1
S
election of the preset weekly programmes
3
3
1
5
.
2
Tables of settings
for the preset programmes
3
4
1
5
.
3
Creation of the free
weekly programmes
3
5
1
5
.
4
Tables of settings
for the free programmes
3
6
1
6
.
User operational procedures
.......
.
....
..
........
........
...
.
.
.
...
3
7
1
6
.1
S
tart and stop the heat recovery unit
3
7
1
6
.
2
Selecting the operating mod
e
3
7
1
6
.
3
Manual ventilation function
3
8
1
6
.
4
Automatic mode
3
8
1
6
.
5
Automatic mode with humidity sensor
3
8
1
6
.
6
Automatic mode with
CO
2
sensor
39
1
6
.
7
Party mode
39
1
6
.
8
Holiday
mode
4
0
1
6
.
10 Setting the clock and the day of the week
4
1
1
6
.
9
Activation of weekly programme
4
0
1
7
.
Supplementary functions
.......
.
....
..
........
.....
...
..
......
..
.
....
4
1
1
7
.1
Booster mode
4
1
1
7
.
2
Fireplace function
4
1
1
7
.
3
Boiler function
4
1
1
7
.
4
Free cooling function
4
2
1
7
.
5
Pre
-
treatment function with geothermal coil
4
3
1
7
.
6
Summer mode
4
3
1
7
.
7
Functions block screen
4
3
1
8
.
Antifreeze
function
.......
.
....
..
.
..
.......
.
.........
.....
...
.
........
....
4
4
1
8
.1
With integrated modulating electric resistance
4
4
1
8
.
2
With external modulating electric heater
4
4
1
8
.
3
Without electric resistance
4
4
1
8
.
4
With preheating hydronic coil or ON/OFF resistance
4
4
1
8
.
5
Antifreeze protective circuit chart
4
5
1
9
.
Menus
.
.................................
......
.
....
..
........
.......
.......
.
.
.
....
4
6
1
9
.1
Technical menu
4
6
1
9
.
2
Installer menu
4
6
1
9
.
3
Password-protected menu
46
1
9
.
4
Parameters menu
4
7
1
9
.
5
Read menu
49
1
9
.
6
Read menu reports
5
0
1
9
.
7
Alarms
5
0
2
1
.
Wiring diagrams
.
.......................
......
.
....
..
.......
..
.......
..
.
....
5
4
20
.1
User maintenance
5
1
20
.
2
Installer
maintenance
5
2
20
.
3
Check the heat exchanger
5
2
20
.
4
Check the
fans
5
3
20
.
M
aintenance
.
.......................
......
.
....
..
........
.......
.....
....
...
..
5
1
2
2
.
Declaration of conformity
.
.......
......
.
....
..
.......
..
........
.
.
....
6
0
2