lindab  |  for a better climate

4.4   Water quality

Lindab recommend water treatment and quality to be according to VDI 2035-2.

 

– The water preparation and maintenance for the chilled beam water circuit should be 

handled by a specialist

 

– To prevent corrosion, the water circuit must be airtight

 

– The water system must also be equipped with aerators to remove any build-up air in 

the system.

 

– The water should be oxygen free, to prevent corrosion.

 

– The water system must be filled with potable water that complies with the EC direc-

tive 98/83/EC.

 

– pH value of water must be between approximately 6-9 pH

 

– The water velocities should not exceed 1m/s, and should be kept as close to the 

nominal flow as possible to minimize noise and optimize the energy yield

 

– There should be used in-line strainers to remove dirt particles from the water.

 

– If the water contains any additive inhibitor this must be appropriate to use with copper 

and solder. 

4.5   Air quality

 

– Primary supply air should be clean and filtered before reaching the beam.

4.6   Capacity test

 

– Lindabs active chilled beams are Eurovent-certified and tested according to 

EN-15116. 

Содержание ARCHITECT Circum

Страница 1: ...hout written permission are forbidden is the registered trademark of Lindab AB Lindab s products systems product and product group designations are protected by intellectual property rights IPR Lindab...

Страница 2: ...ation The primary air supply should be connected with instructions from a ventilation specialist Lindab s chilled beams can beneficially be used together with Lindab s Safe duct systems 1 5 Connection...

Страница 3: ...r the specific fitting for further details on proper installation Both inlet and return pipes are covered by a plastic or rubber protection cover which must be removed before installation After removi...

Страница 4: ...t must be inserted into the pipe always part of the delivery The copper insert should be placed inside the pipe on the beam Always support the copper pipe coil when inserting the copper insert into po...

Страница 5: ...n Product Product configuration Project Project name Mark Marking noted on order Nozzles Number of nozzles Plugs Number of plugged nozzles Product ID Product number Sign To be signed when checked and...

Страница 6: ...ce Lindab reserves the right to make changes without prior notice 2022 10 18 lindab for a better climate 2 2 2 Calculating the airflow After measuring the static nozzle pressure read the setting of th...

Страница 7: ...our pins in the corners so the mean value of the pins will correspond with the mean value found in the diagram Example Pin setting 6 6 8 8 28 4 mean value 7 3 0 Maintenance The interval of cleaning de...

Страница 8: ...ssure class PN10 4 2 Environmental declaration Please follow the links below Building product declaration Declaration of conformity Eurovent certificate 4 3 Pressure class The waterborne products in L...

Страница 9: ...ygen free to prevent corrosion The water system must be filled with potable water that complies with the EC direc tive 98 83 EC pH value of water must be between approximately 6 9 pH The water velocit...

Страница 10: ...refore made it our most important objective to contribute to an indoor climate that improves people s lives We do this by developing energy efficient ventilation solutions and durable building product...

Отзывы: