Operation, continuation 

Operation 

Â

  For the operation of a centralized lubrication system 

-  all QSL metering devices must be designed for the lu-

bricant metering volume prescribed by the machine 
manufacturer 

-  adjust the timing of the lubrication procedure to the 

pause times prescribed by the machine manufacturer 

-  observe the operating pressure (hydraulic pressure) re-

quired for the operation of the QSL metering devices as 
well as the following pressure relief of the main line (for 
changing-over the QSL metering devices) 

Â

  To shut the machine down 

-  the centralized lubrication system must be switched off. 

 

1 013A94 

CAUTION! 

Excessive or poor lubrication may result in 
machine damages. Do not use any con-
taminated lubricants. 
 

 

1 013A94 

WARNING! 

Do not exceed the admissible operating 
pressure of the centralized lubrication 
system. Shut pump down immediately in 
case of defects or strange operating be-

havior. 
When starting the machine up again after 
a longer stoppage, verify the functional 
capability of the centralized lubrication 

system! 

Inspection and Maintenance 

 

1 013A94 

WARNING! 

Do not carry out any disassembly works 
as long as the pump is operating or pump 
and system are still pressurized. Carry out 
maintenance or repair works only after 
shutting down the machine. 
 

Â

  Check tightness, intactness and functional capability of all 

lubricant lines, QSL metering devices and pump at regular 
intervals. 

Â

  Remedy any deficiencies immediately. 

Â

  Observe the safety indications by the machine manufac-

turer. 

Â

  If during the maintenance and repair works of the machine 

parts are disassembled that belong to the centralized lu-
brication system, make sure that these parts are properly 
reassembled before the restart of the machine. Verify the 
functional capability of the centralized lubrication system 
professionally. 

Â

  Avoid contaminations of the indicator pin of the metering 

device as these may result in an early wear of the meter-
ing device’s sealing. 

Troubleshooting 

‚

  Only qualified service personnel may remedy appearing 

failures. 

Â

  See User Manual of the respective centralized lubrication 

pump. 

Â

  See User Manual of the respective control and monitoring 

devices as well as Instructions by the machine manufac-
turer. 

 

10 13A94 

CAUTION! 

Operating the machine with disconnected 
or defective centralized lubrication system 
results in damages to the machine (see 
Indications by the machine manufacturer). 
 

‚

  Failures on individual lubricant injectors or feed lines re-

sult in defects on the individual lube points that are not 

provided with lubricant. 

Repair 

‚

  Only qualified and authorized personnel may carry out 

repair works. 

 

10 13A94 

WARNING! 

Do not disassemble metering device while 
pump and/or centralized lubrication sys-
tem is pressurized. 
Disconnect machine from the power sup-
ply before carrying out any repair works. 
Before disassembly shut down pump and 

centralized lubrication system and de-
pressurize pump and lines. Collect leaking 
lubricants in containers always. 

Â

  After repair works on QSL metering devices: 

-  Verify functional capacity of the metering devices. 

‚

  Injectors may be exchanged without disassembling the 

divider bar – after the repair, but before the restart of the 
machine and the centralized lubrication system: 

Â

  Vent the lines of the lubrication system and verify the 

functional capability of the centralized lubrication system. 
(See chapter “Check functional capability of QSL metering 
devices", page 12). 

 

Spare Parts 

Â

  Replace only complete injectors or divider bars. 

Â

  Order designations, see chapter “Technical Data“, page 9. 

Содержание QSL

Страница 1: ...Subject to modifications User Manual OperationInstructions 4 2EN 18005 C10 LINCOLN GmbH Postfach 1263 D 69183 Walldorf Tel 49 6227 33 0 Fax 49 6227 33 259 QSL Metering Device 6724 b06 810 53029 1...

Страница 2: ...anufacturer by Lincoln GmbH EdiDoc GmbH Heinrich Hertz Str 2 8 Erzberger Str 8 D 69169 Walldorf D 68753 Wagh usel All rights reserved Any duplication of this User Manual in its entirety or in part by...

Страница 3: ...f Hydraulic Hoses 6 Description QSL Metering Device 7 Installation Safety Instructions 8 Required Tools 8 Attachment of Injectors to Divider Bar 8 Assembly and Disassembly of Injectors 8 Accessories 8...

Страница 4: ...r sequence of contents Procedural instruction User s Responsibility To ensure the safe operation of the unit the user is responsi ble for the following 1 The pump system shall be operated only for the...

Страница 5: ...above inappropriate disposal of used or contaminated lubricants or components that were in touch with lubricant unauthorized modification of system parts use of unauthorized spare parts operation wit...

Страница 6: ...ust not rub against metal components or edges are to undergo regular visual checks and must be ex changed in the case of wear at the latest after 2 years from the date of installation Pay attention wi...

Страница 7: ...ars has fallen below 60 bar are in the lubrication pause phase pause time as soon as the lubricant pressure in the main line and at the me tering device inlet has fallen below 60 bar are in the lubric...

Страница 8: ...e used Place of attachment see plan instructions by the machine manufacturer Assignment of lube points to the injectors see plan instructions by the machine manufacturer Further make sure that the pla...

Страница 9: ...of the QSL metering device indications in mm A Measures see following chart Divider bars tolerance 0 2 mm B Measures see following chart Divider bars C SW 10 15 Nm 10 D SW 24 40 Nm 10 E SW 24 40 Nm 1...

Страница 10: ...2 4 upward The indicator pin 1 1 is pressed outward as a visual func tion control Final metering position see Fig 5 The metering chamber 2 5 is filled until the upper end of the spring sleeve 2 4 tou...

Страница 11: ...amber 2 4 Spring sleeve 2 5 Metering chamber 2 6 Metering channel 2 7 Shifting channel 3 Valve 3 1 Valve sealing lip P1 Pressure of main line divider bar P2 Outlet to the lube points P1 Pressure of ma...

Страница 12: ...as metering devices must be primed and vented feed lines must be primed and connected all metering devices must have been checked with re gard to their functional capability all metering devices as we...

Страница 13: ...sembled that belong to the centralized lu brication system make sure that these parts are properly reassembled before the restart of the machine Verify the functional capability of the centralized lub...

Страница 14: ...Page 14 of 16 User Manual OperatingInstructions Subject to modifications 4 2EN 18005 C10 LINCOLN GmbH Postfach 1263 D 69183 Walldorf Tel 49 6227 33 0 Fax 49 6227 33 259 Note...

Страница 15: ...Normes harmonis es no tamment en la versi n suministrada es destinada a ser incorporada en una m quina y que su puesta en servicio est prohibida antes de que la m quina en la que vaya a ser incorpora...

Страница 16: ...ributers monitoring devices and accessories in stock and meet our exacting demands with their specialised knowledge about products installations and service Whenever and wherever you need our experts...

Отзывы: