Lincoln QSL Скачать руководство пользователя страница 12

Page 12 of 16

User Manual

Operating Instructions

Subject to modifications

4.2EN-18005-C10

LINCOLN GmbH • Postfach 1263 • D-69183 Walldorf • Tel +49 (6227) 33-0 • Fax +49 (6227) 33-259

 

Operation 

Safety indications 

 

1 013A94 

WARNING! 

Never exceed the centralized lubrication 
system’s max. operating pressure of 
300 bar. 
Do not carry out any assembly or disas-
sembly works while the system is pressur-
ized or the pump/machine is operating. 
Before using any synthetic lubricants, 
check their compatibility with the materials 

of the metering devices and other system 
components. 

Preparation for operation 

‚

  of centralized lubrication pump and timer: 

-  see User Manual for the respective components 
-  see Instructions and Safety Indications by the manufac-

turer/ supplier of the machine. 

Start-up 

 

1 013A94 

CAUTION! 

Wear protective glasses when venting the 

lubricant lines; avoid splashes. 

 

Before the start-up 

‚

  see Instructions and Safety Indications by the manufac-

turer/ supplier of the machine 

 

Prime and vent the main line 

Â

  Before the metering devices can be operated, the follow-

ing measures must be carried out: 
-  Fill main line with lubricant 
-  Vent stub lines and ascending lines of the main line 
-  When filling and venting the lines, operate pump at low 

pressure 

-  Make sure helpers with containers are available to col-

lect the leaking lubricant during the venting procedure. 

-  Check lubricant main line for leakages. 

 

 

6001a 02 

IMPORTANT NOTE 

The QSL metering devices have been 
designed for a max. operating pressure of 

300 bar. 

Â

  Before the machine start-up, after completion of installa-

tion or repair works: 
-  main and stub lines as well as metering devices must 

be primed and vented. 

-  feed lines must be primed and connected 
-  all metering devices must have been checked with re-

gard to their functional capability 

-  all metering devices as well as the timing of the lubricat-

ing intervals must be adjusted according to the prescrip-

tions. 

-  See Instructions by the machine manufacturer. 

 

Verify functional capability of QSL metering devices 

Â

  Adjust pump and timer in such way that the recommended 

operating pressure of 140-300 bar is adhered to. 

Â

  Trigger lubrication pulse manually 

(see User Manual for the respective centralized lubrication 
pump, timer and QSL metering device) 

‚

  With an operating pressure 

 

140 bar, the indicator pin is 

extracted. 
After a pressure relief down to 

 60 bar the indicator pin is 

retracted again. 
Incomplete venting of the main line may impact the func-

tion of the metering devices. 

 

Priming of lubricant feed lines 

‚

 Precondition: 

The proper functioning of all metering devices of the sys-
tem has been stated (see above, chapter "Verify func-
tional capability of metering devices"). 

Â

  Before connecting the lubricant feed lines to the lubrica-

tion points: 
-  Prime lubricant feed lines with lubricant. Make sure to 

use only the lubricant specified by the machine manu-

facturer 

-  Fill the lines with lubricant by means of a grease gun 
-  Check for leakages on the lubricant feed lines and, if 

there are any, eliminate them 

-  Collect lubricant leaking from the end of the lubricant 

feed line during the filling process in containers 

Â

  When all lines are primed: Connect the lubricant feed 

lines. 

 

 

6 001a0 2 

IMPORTANT NOTE 

In the case of backpressures in lubrication 
point lines of 

 100 bar or if several injec-

tors are combined to one lubrication point, 
use check valves. 
Check valves for connection at lubrication 
point outlets: 
Part no. ................................. 223-12289-7 

 

Содержание QSL

Страница 1: ...Subject to modifications User Manual OperationInstructions 4 2EN 18005 C10 LINCOLN GmbH Postfach 1263 D 69183 Walldorf Tel 49 6227 33 0 Fax 49 6227 33 259 QSL Metering Device 6724 b06 810 53029 1...

Страница 2: ...anufacturer by Lincoln GmbH EdiDoc GmbH Heinrich Hertz Str 2 8 Erzberger Str 8 D 69169 Walldorf D 68753 Wagh usel All rights reserved Any duplication of this User Manual in its entirety or in part by...

Страница 3: ...f Hydraulic Hoses 6 Description QSL Metering Device 7 Installation Safety Instructions 8 Required Tools 8 Attachment of Injectors to Divider Bar 8 Assembly and Disassembly of Injectors 8 Accessories 8...

Страница 4: ...r sequence of contents Procedural instruction User s Responsibility To ensure the safe operation of the unit the user is responsi ble for the following 1 The pump system shall be operated only for the...

Страница 5: ...above inappropriate disposal of used or contaminated lubricants or components that were in touch with lubricant unauthorized modification of system parts use of unauthorized spare parts operation wit...

Страница 6: ...ust not rub against metal components or edges are to undergo regular visual checks and must be ex changed in the case of wear at the latest after 2 years from the date of installation Pay attention wi...

Страница 7: ...ars has fallen below 60 bar are in the lubrication pause phase pause time as soon as the lubricant pressure in the main line and at the me tering device inlet has fallen below 60 bar are in the lubric...

Страница 8: ...e used Place of attachment see plan instructions by the machine manufacturer Assignment of lube points to the injectors see plan instructions by the machine manufacturer Further make sure that the pla...

Страница 9: ...of the QSL metering device indications in mm A Measures see following chart Divider bars tolerance 0 2 mm B Measures see following chart Divider bars C SW 10 15 Nm 10 D SW 24 40 Nm 10 E SW 24 40 Nm 1...

Страница 10: ...2 4 upward The indicator pin 1 1 is pressed outward as a visual func tion control Final metering position see Fig 5 The metering chamber 2 5 is filled until the upper end of the spring sleeve 2 4 tou...

Страница 11: ...amber 2 4 Spring sleeve 2 5 Metering chamber 2 6 Metering channel 2 7 Shifting channel 3 Valve 3 1 Valve sealing lip P1 Pressure of main line divider bar P2 Outlet to the lube points P1 Pressure of ma...

Страница 12: ...as metering devices must be primed and vented feed lines must be primed and connected all metering devices must have been checked with re gard to their functional capability all metering devices as we...

Страница 13: ...sembled that belong to the centralized lu brication system make sure that these parts are properly reassembled before the restart of the machine Verify the functional capability of the centralized lub...

Страница 14: ...Page 14 of 16 User Manual OperatingInstructions Subject to modifications 4 2EN 18005 C10 LINCOLN GmbH Postfach 1263 D 69183 Walldorf Tel 49 6227 33 0 Fax 49 6227 33 259 Note...

Страница 15: ...Normes harmonis es no tamment en la versi n suministrada es destinada a ser incorporada en una m quina y que su puesta en servicio est prohibida antes de que la m quina en la que vaya a ser incorpora...

Страница 16: ...ributers monitoring devices and accessories in stock and meet our exacting demands with their specialised knowledge about products installations and service Whenever and wherever you need our experts...

Отзывы: