IS141 ECN 2740
3
Assembly of Enclosures
Before lighting the appliance please ensure the heat transfer channels, their supports, the drain tray,
fat collection drawer, splash surround, branding plates, flue top and debris tray are in the correct
positions.
1. HEAT TRANSFER CHANNELS x 9
2. HEAT TRANSFER CHANNEL SUPPORT ARMS x 2
3. DRAIN TRAY
4. FAT DRAWER
5. SPLASH SURROUND
6. BRANDING PLATES x 5
7. FLUE TOP
8. DEBRIS TRAY
1
2
3
4
5
6
7
8