Document
: LH-A136-15-OB-OPM-DR-1.00
Page 13 of 37
© Lighthouse Technologies Ltd.
HK: T
+852 2192 1688
F
+852 2423 1092
[email protected] www.lighthouse-tech.com
2.
Screen assembly
a. First, the 8 PCS fixed screw behind the box are assembled to the box and locked with tools.
b. The following figure is marked in red.
3.1.2 Screen Installation
Brief installation diagram
Rear view
Large-headed Screw