Thread the cable back underneath and up the space which leads to the gap on
the second floor. Pull the cable all the way out.
11.)
From the front of the set, lift up the two side roof sections above the front
door. Pull the other end of the 30cm cable over to this side and secure it by
disconnecting the right roof side section and reconnecting it over the cable,
ensuring the cable is laid in between studs.