FINAL TESTS
IM.TEC.028.EN_rev.10.2
- November 2015
All rights reserved
This manual contains the list of final tests needed for lift commissioning by the installer. Upon the commissioning completed, the
installer will sign the protocol, indicating the exact date and the data of the installation company and special notes, if any.
The manual must be signed by the owner of the lift, to confirm the final commissioning and handover of the lift and the ownership
of all the related documentation.
This manual must be filled in, following the instructions stated in the below paragraphs: the manual must be kept nearby the lift as
part of the conformity documents; the last page form must be sent to the Supplier within 15 days from the date stated on the form
itself, so that the warranty period can start in due time.
Should the form not be sent as per the above instructions, the warranty will start on the date of shipment and will not exceed the
standard term.
The single tests described below are to verify the correct assembly: each of them contains the requirements to be matched and the
way to check them.
The operations described in this paragraph, can be carried out by adequately qualified personnel.
The below listed operations are to support standard test procedures required by project and electrical drawings.
Should any of these operations lead to negative results, the related assembly operation must be repeated in accordance with
installation instructions.
Before accessing the pit, open the main driving forse switch and activate the safe pit device.
Some of the operations require that the control cabinet be open and under power.
The tests are to be effected with the empty car, except those cases when the load is required.
NOTE 1
: When the tests are to be effected “with the maximum static load”, the car must be evenly loaded as follows:
Nominal car load (kg)
250
315
385
500
Weight to be loaded (kg)
313
394
481
625
NOTE 2
: When the tests are to be effected “with the maximum load”, the car must be evenly loaded with the weight equal to the
nominal load (indicated on the car plate).
NOTE 3
: When the instructions recommend to “Refresh”, go backwards through the steps described, to bring the lift back to the
starting conditions.