31
TOOLS AND HARDWARE REQUIRED
X
SECTION 5 (CONTINUED)
5.3
5.4
9/16”
(14 mm) (x2)
ABA
(x2)
ABB
(x2)
6 1/2
”
(16.5 cm)
ABA
ABB
AMN
AKI
• Position the
Trigger (AMN)
inside of the
Handle (AKI)
as shown, and secure the Trigger to the Handle with the
hardware shown. Make sure the Nut is fl ush with the end of the Bolt, and be careful not to overtighten the
hardware.
• Secure the
Handle (AKI)
to the
Top Pole (ALH)
with the hardware shown. Make sure to place the
Spacers (AQF)
between
the Handle Assembly and the Top Pole as shown.
• Tighten the 3/8” Centerlock Nut (ABB)
until it is fl ush with the end of the Bolt.
!
ABB
ABA
AQF
AQF
AKI
AQF
• Tighten the 3/8” Centerlock Nut (ABB)
until it is fl ush with the end of the Bolt.
!
AQF
(x2)