17
X
SECTION 3 (CONTINUED)
TOOLS AND HARDWARE REQUIRED
3.4
• Insert the
U-Bolt (APZ)
through the upper part of the opening on the backside of the
Backboard (AJI)
. Connect the
Rim (ALX)
and
Plastic Guard (ALD)
to the
Backboard (AJI)
with the hardware as shown.
ABK
(x2)
BGR
(x1)
APZ
(x1)
1/2” (13 mm)
(2)
ABK
APZ
APZ
BGR
AJI
EAP
ALX
ALD