9
4
1MBDFUIFwYSFCBS OPUJODMVEFE
inside the Bottom Pole (BP).
Check the pole several times within the first
hour to make sure that all sides are vertical
and that the pole does not sink into the
DPODSFUF5IFwNBSLNVTUSFNBJOMFWFM
with the playing surface.
Rebar
Allow 1-4 hours for the concrete
to set.
Do not continue until the concrete has set for 1-4 hours.
5
Remove the straight object from the top of the
pole.
.JYUIFSFNBJOJOHCBHPGDPODSFUFBOEQPVSUIFDPODSFUF
into the Bottom Pole until it is just below the slots in the top of
the pole.
Do not overfill the pole, or you may not be able to assemble the rest of
the pole sections.
Tamp the concrete down in the Bottom Pole with a
broom handle to remove any air pockets.
$MFBOBMMFYDFTTDPODSFUFPGGUIFPVUTJEFTVSGBDFPG
the pole.
STOP!
The concrete must cure for at least
72 hours (3 days)
before installing the rest of the
system. In humid climates or wet weather, allow additional time for the concrete to
cure. Do not proceed until the curing process is complete.
Содержание POWER LIFT 71281
Страница 1: ...1...
Страница 7: ...7 MH MQ MJ MS MI MB MR TA FA TC ML MN MM TB MG...
Страница 22: ...22 XX 35 Attach the Pole Pad XX to the Pole with the top strap above the handle as shown...
Страница 24: ...24 NOTES...
Страница 25: ...25 NOTES...
Страница 26: ...NOTES...