19
MN
MG
MB
AN
AN
30
5IFSFNVTUCFBwYw4QBDFS ./CFUXFFOFBDI
4IPSU&YUFOTJPO"SN "/BOEUIFQPMF
Completely tighten the Nuts from steps 29
through 31.
(2)
MB
(1)
7 1/8”
(Not actual length)
w8SFODIFT
1039829
Required For This Page:
Attach the Net (AB).
Please call our Customer Service Department at
the number on Page Two to obtain replacement
Nets. Our Nets are shorter than average to reduce
the risk of entanglement.
31
32
Apply Grease (MO) to
these areas.
AB
MG
(1)
AS
MN
Содержание POWER LIFT 71281
Страница 1: ...1...
Страница 7: ...7 MH MQ MJ MS MI MB MR TA FA TC ML MN MM TB MG...
Страница 22: ...22 XX 35 Attach the Pole Pad XX to the Pole with the top strap above the handle as shown...
Страница 24: ...24 NOTES...
Страница 25: ...25 NOTES...
Страница 26: ...NOTES...