11
3. Left/Right Handrail Arms, Left/Right Foot Bars, Left/Right Foot Pedals, and Foot
Bar Covers-A/B Installation
Remove two M10x18 Hexagon Head Bolts (43), two Ø18xØ10.5x3 Spring Washers (44),
two Ø30xØ10x
δ
2.5 Washers (65), and two Ø28x5 Washers (45) from the left and right
horizontal axes of the Front Post (5). Remove bolts with the Multi Hex Tool provided.
Attach the Left Handrail Arm (3L) onto the left horizontal axis of the Front Post (5) with one
M10x18 Hexagon Head Bolt (43), one Ø18xØ10.5x3 Spring Washer (44), one
Ø30xØ10x
δ
2.5 Washer (65), and one Ø28x5 Washer (45) that were removed. Tighten
bolts with the Multi Hex Tool provided. Install a S17 Bolt Cap (49) onto the M10x18
Hexagon Head Bolt (43).
Attach the left U Shape Bracket (23) to the left Crank (78) with one Bolt for left U Shape
Bracket (16L), one Ø28xØ17x0.3 Wave Washer (18), one Ø8.0 Spring Washer (20), and one
1/2” Left Nylon Nut (17L). Tighten bolt and nylon nut with the 8mm Allen Wrench and Multi
Hex Tool provided. Install a S14 Bolt Cap (31) onto the M8x50 Hexagon Head Bolt (26).
Multi Hex Tool
Allen Wrench 8mm
Multi Hex Tool with Phillips Screwdriver
S8, S13, S14, S15
IMPORTANT:
Please make sure the 1/2” Left Nylon Nut
(17L) matches up with the Bolt for left U
Shape Bracket (16L) and the1/2” Right
Nylon Nut (17R) matches up with the Bolt
for right U Shape Bracket (16R).
If reversed the Nylon Nuts may become
damaged.
Tool:
3L
79
2L
28
27
36
29
31
26
79
33L
33R
3R
5
2R
51
3L
3R
5
16L 18
45
43 44
49
78
23
65
20 17L