28
Step 3
Pull the Pec Cable (30) downwards to the Crossed Double Floating Pulley Bracket (19).
Draw the Pec Cable (30) around the Pulley (44) on the Crossed Double Floating Pulley
Bracket (19). Then attach the Pulley (44) onto the Crossed Double Floating Pulley Bracket
(19) with one M10 Nylon Lock Nut (60), one M10x45 Hexagon Head Bolt (70), and two Ø10
Washers (64). Tighten bolt and nut with two Wrenches provided.
Attach the Pec Pulley Bracket (21) onto the right clevis of the Main Support Tube (5) with
one M10 Nylon Lock Nut (60), one M10x65 Hexagon Head Bolt (69), and two Ø10 Washers
(64). Tighten bolt and nut with two Wrenches provided.
Pull the Pec Cable (30) upwards to the Pec Pulley Bracket (21).
Insert the Pec Cable (30) around the Pulley (44). Then attach the Pulley (44) onto the Pec
Pulley Bracket (21) with one M10 Nylon Lock Nut (60), one M10x45 Hexagon Head Bolt (70),
and two Ø10 Washers (64). Tighten bolt and nut with two Wrenches provided.
Attach the other end of the Pec Cable (30) onto the Right Pec Arm (10) with one M10 Nylon
Lock Nut (60), one M10x25 Hexagon Head Bolt (66), and two Ø10 Washers (64). Tighten
bolt and nut with two Wrenches provided.
PLEASE REFER TO THE “CABLE LOOP DIAGRAM” SECTION ON PAGE
20.
30
19
64
64 70
60
19
44
2 Wrenches (19-17)
Tool:
Содержание 63110
Страница 4: ...3 PARTS NUMBERS AND ILLUSTRATIONS ...