19
Step 11
Attach the Right Pec Arm (10) onto the Support Frame for Pec Arm (7) with one M12x115
Hexagon Head Bolt (76), one M12 Nylon Lock Nut (59), and two Ø12 Washers (62).
Tighten bolt and nut with two Wrenches provided. Install two M12 Hexagon Nut Caps (82)
onto the M12x115 Hexagon Head Bolt (76) and M12 Nylon Lock Nut (59). Slide the
Ø90x245 Pec Foam Roll (53) onto the Right Pec Arm (10). Attach the Handle (9) onto the
Right Pec Arm (10) with one Ø10 Washers (64) and one M10x25 Hexagon Head Bolt (66).
Use the same procedure to install the Left Pec Arm (11) onto the Support Frame for Pec Arm
(7).
Hardware:
Plastic Parts:
7
66
64
9
53
10
82
59
62
82
76
62
11
2 Wrenches (19-17)
Tool:
4 Hexagon Nut Caps (M12)
2 Hexagon Head Bolts
(M12x115)
2 Nylon Lock Nuts (M12)
4 Washers (Ø12)
2 Washers (Ø10)
2 Hexagon Head Bolts
(M10x25)
Содержание 63110
Страница 4: ...3 PARTS NUMBERS AND ILLUSTRATIONS ...