9
STEP 8:
FIGURE 8
•
SECURELY
assemble the COUNTERBALANCE (7) to the PIVOT ARM (4) using two RH CAPS (44), one 3/8 X 2-1/2” BOLT
(13), two 3/8” SAE WASHERS (21), two 3/8” RH WASHERS (23) and one 3/8” LOW HEIGHT LOCK NUT (19) as shown in
FIGURE 8.
STEP 9:
FIGURE 9
• Slide the end of the CABLE into the bushing on the PIVOT ARM (4) as shown in FIGURE 9.
13 3/8 X 2-1/2”
23
44
21
7
4
19
4
CABLE
1A
1A