13
• Screw the treaded end of the CABLE approximately 1” into the end of the shaft on the HEAD PLATE (11) and tighten jam nut
securely. See FIGURE 14.
STEP 14:
FIGURE 14
• Insert the WEIGHT STACK PIN (27) into the WEIGHT STACK as shown in FIGURE 14.
•
SECURELY
assemble the GUIDE ROD SUPPORT (5) to the TOWER (1) using four RH CAPS (44), two 3/8 X 2-1/2” BOLTS
(13), four 3/8” RH WASHERS (23) and two 3/8” LOW HEIGHT LOCK NUTS (19) as shown in FIGURE 14.
(NOTE: Be sure
to route cable through the hole of the GUIDE ROD SUPPORT (5) before tightening.)
TIGHTEN!
13 3/8 X 2-1/2”
44
23
19
44
32
30
11
27
• Slide GUIDE ROD BUSHINGS (32) into the tubes on the GUIDE ROD SUPPORT (5), slide 1” SHAFT COLLARS (30) under-
neath the GUIDE ROD BUSHINGS (32) and
SECURELY
tighten the set screws.
5
• If the HEAD PLATE (11) does not sit on top of the first WEIGHT PLATE (38), push the head plate down, insert the SELECTOR
PIN (27) and perform several repetitions on the machine. This will relax the cable system and prevent the HEAD PLATE (11) from
lifting up.
• If after completing previous step the HEAD PLATE (11) still does not sit on top of the first WEIGHT PLATE (38) or if there is
excess slack in the cable system, adjust the threaded end of the CABLE accordingly and retighten the jam nut.
1