Lifasa MCE06ADV Скачать руководство пользователя страница 6

                                                                                                                         

Controllers MCE06ADV – MCE12ADV 

 

 

- 5 - 

Program 1:2:2. All capacitor stages from the second and up have a rated power (kvar) which is twice the 
rated power of first stage. For instance, a 5-stage unit of 180 kvar would be formed by a first stage of 20 
kvar and 4 equal stages of 40 kvar, and would be described as a unit of (20 + 4 x 40) kvar.  

Program 1:2:4.  The rated power of the second stage is twice the rated power of the first stage and the 
rated power of third stage  and  up is  4 times the power of the first stage. For  instance, a  5-stage  unit of 
300 kvar would be formed by a first stage of 20 kvar, a second stage of 40 kvar and 3 equal stages of 80 
kvar, and would be described as a unit of (20 + 40 + 3 x 80) kvar.  

Other  switching  programs.  Other  switching  programs  are  also  commonly  available,  like  1:2:2:4  or 
1:1:2:2,  etc.  Abbreviated  designation  form,  as  can  be  deduced  from  previous  cases,  consists  of  a 
sequence  of  numbers  giving  the  relationship  between  the  different  stage  powers  (kvar),    and  the  first 
stage power, which value is taken as unit (1 ). The successive stages will be designated by 1, or 2 or 4, 
etc. meaning that the kvar ratio of such stages with regard to first stage are equal, twice, four times, etc.  

 

GENERAL CHARACTERISTICS 

 

 

The power factor regulators, of types MCE06ADV  and 
MCE12ADV  measure  the  cos

φ

  (sometimes  called 

Displacement  Power  Factor,  DPF)  in  a  supply  network 
and control the connection and disconnection of power 
capacitors in order to regulate such parameter. 

The difference between the two types is the number of 
output  relays,  which  determines  the  number  of  stages 
that they can control. 

Type 

Maximum Nr of 

output relays 

MCE06ADV 

6 relay outputs 

MCE12ADV

  

 

12 relay outputs 

 

 
Among the most important features of this PF regulator series we can stand out the following: 

FCP regulation system, which minimizes the number of switching operations. 

 Wide choice of switching programs: 1:1:1, 1:2:2, 1:2:4 , 1:1:2:2, etc. which allows the split up of 

the total power into up to 31 steps in MCE06ADV

    

 or up to 79 steps in MCE12ADV.

    

  

Four  quadrants  control  (see  fig.2.1)  ,  display  of  the  connected  stages,  of  cos

φ

  and  active  and 

reactive power signs (inductive 

 or capacitive 

LCD display screen with three seven segments characters plus 20 icons to sign up the different 
possible working conditions. 

Regulator set-up with only three keys and without disconnecting the device from the supply. 

Multiple supply frequency range, either 50 or 60Hz 

Main electrical parameters displayed during RUN mode 

Easy panel mounting, without the need of tools. 

Front frame size (144 x 144 mm) according to  DIN 43 700 (panel hole 138

+1

 x 138

+1

  mm)   

Measurement and power supply in one single input. 

Four quadrant regulation (suitable for installations importing or exporting energy) 

 

 

 

Fig.  2.1.- Power signs in four quadrants measurements 

Содержание MCE06ADV

Страница 1: ...POWER FACTOR REGULATORS MCE06ADV MCE12ADV Instructions Manual...

Страница 2: ...Controllers MCE06ADV MCE12ADV 1...

Страница 3: ...8 4 INSTALLATION AND START UP 9 4 1 TECHNICAL CHARACTERISTICS 9 4 2 DEVICE INSTALLATION 10 4 2 1 Mechanical Installation 10 4 2 2 Connections 10 4 2 3 Cabling cross sections and protections 11 4 2 4...

Страница 4: ...terminals have been properly connected A defective earth connection may cause a wrong operation of equipment and involves a danger of electric shock to the user or system operator Maintenance must be...

Страница 5: ...ch the required PF compensation Moreover the program assigns the capacitor stages to be connected or disconnected using a FIFO criterion FIFO First IN first OUT that way the times of use of all stages...

Страница 6: ...cos sometimes called Displacement Power Factor DPF in a supply network and control the connection and disconnection of power capacitors in order to regulate such parameter The difference between the t...

Страница 7: ...panel shows the following items Fig 3 1 Front cover and screen NOTE The set up procedure the description of different parameters and the different control modes are described in detail in the SET UP...

Страница 8: ...th the navigation keys and is indicated by the cursor 3 3 Errors and ERROR messages In case that the regulator detects a possible error the front screen shows an error code The possible error codes ar...

Страница 9: ...accept configuration changes Manual connection of capacitor stages If this key is pushed for more than 1s the regulator starts connecting new steps in a sequential mode respecting the adjusted connect...

Страница 10: ...n 1 5mm 2 Supply circuit protection By means of a 0 5 to 2A fuse gl type Current measurement circuit Terminals A B External Current Transformer CT Current ratio In 5 To be placed preferably in phase L...

Страница 11: ...side the equipment cabinet MCExxADV devices require current sensing of the installation A current transformer CT must be installed externally to perform this function Usually the current ratio of the...

Страница 12: ...V P1 P2 Fig 4 2 Connection schematic for MCE06ADV N Terminals functions A Current input S1 B Current input S2 COM Relays common 1 Relay Output 1 2 Relay Output 2 3 Relay Output 3 4 Relay Output 4 5 Re...

Страница 13: ...smaller capacitor step kvar For conditions other than those given in table 5 1 the paragraph 5 13 shows a simple calculation to obtain the C K value See also foot NOTE Table 5 1 C K factor according t...

Страница 14: ...ngs Taking as base the power of the smaller capacitor stage the powers of the rest of stages can be given in terms of multiples of the smaller step Then we could state the configuration configuration...

Страница 15: ...tween 0 7 and 1 Table 5 3 Phase shift options in MCExxADV Screen V I phase shift at cos 1 V measured in phases CT placed in phase T1 30 L3 L2 L3 T2 270 L3 L2 L1 T3 150 L3 L2 L2 T4 210 L3 L2 L3 P1 P2 o...

Страница 16: ...C K Program Delay times Nr of stages CT phase CT primary current 5 1 5 2 5 3 5 4 5 5 5 6 5 7 5 8 IMPORTANT While the device is in set up mode if there isn t any key pushing for more than 3 minutes th...

Страница 17: ...equentially connect the different steps following the normal program and respecting the delay time ton set in the set up procedure long Manual disconnection of capacitor stages Keep the key pushed dur...

Страница 18: ...gh the regulation may be wrong the device tries to regulate the PF normally Overvoltage The measured voltage is 15 above rated voltage Possible causes Connection to a wrong supply voltage Alarm relay...