4
PREPARATION
These installation instructions provide all the
information needed for positioning the Extended
Battery Cabinet (including environmental
requirements) and for connecting the input and
output power cables.
Inspection
Upon receiving the Extended Battery Cabinet,
examine the packaging for any signs of
mishandling or damage. If any damage is noted,
call your local Liebert representative and/or notify
your carrier.
Environment
Required Setup Equipment
The tools below are required in order to properly
set up your Extended Battery Cabinet.
• Pallet jack
• 13 mm or 1/2" wrench
• Flathead screwdriver
• #2 Phillips screwdriver
Site Preparation
When deciding where to locate your Extended
Battery Cabinet, consider the weight and size of
the unit. Make sure that the structural integrity of
the floor can withstand the weight. Refer to the
table below for size and fully populated weight
considerations:
Check to make sure that your Extended Battery
Cabinet will be located in a well-ventilated area
with at least 300 mm (12”) behind it. It should have
at least one meter (39 in.) in front to change
modules when necessary.
The unit frame is bolted to the shipping pallet to
ensure safety. It is recommended that a pallet jack
be used to transport the unit to its operating
location (prior to unbolting the unit).
NOTE
Operating in temperatures above 77°F
(25°C) will reduce battery life. The
environment must be free of conductive
contaminants and excessive moisture
(water condensation), flammable vapors,
chemical fumes, or corrosive gases and
liquids.
Max Weight
lbs (kg)
H x W x D
in (mm)
942
(427)
52" x 20" x 28"
(1320 x 508 x 711)
1 meter
(39 in.)
300 mm
(12 in)
Содержание Nfinity Extended Battery Cabinet
Страница 1: ...POWER PROTECTION Extended Battery Cabinet for Nfinity USER MANUAL...
Страница 2: ......
Страница 4: ......
Страница 16: ...12...
Страница 17: ......