LEAKAGE TEST AND EVACUATION
Evacuation
1
Connect the charge hose end described in
the preceding steps to the vacuum pump
to evacuate the tubing and indoor unit.
Confirm the "Lo and Hi" knob of the mani-
fold valve is open. Then, run the vacuum
pump.
The operation time for evacuation varies
with tubing length and capacity of the
pump. The following table shows the time
required for evacuation.
2
When the desired vacuum is reached,
close the "Lo and Hi" knob of the manifold
valve and stop the vacuum pump.
Finishing the job
1
With a service valve wrench, turn the
valve stem of liquid side valve counter-
clockwise to fully open the valve.
2
Turn the valve stem of gas side valve
counter-clockwise to fully open the valve.
3
Loosen the charge hose connected to the
gas side service port slightly to release the
pressure, then remove the hose.
4
Replace the flare nut and its bonnet on the
gas side service port and fasten the flare
nut securely with an adjustable wrench.
This process is very important to prevent
leakage from the system.
5
Replace the valve caps at both gas and liq-
uid side service valves and fasten them
tight.
This completes air purging with a vacuum
pump.
The air conditioner is now ready to test run.
Required time for evacuation
when 30 gal/h vacuum pump is used
If tubing length is less
than 10 m(33 ft)
If tubing length is
longer than 10 m(33 ft)
30 min. or more
60 min. or more
0.05 kPa or less
Indoor unit
Outdoor unit
Lo
Hi
Manifold
valve
Vacuum pump
Open
Open
Pressure
gauge
Indoor unit
Outdoor unit
Manifold valve
Vacuum pump
Open
Open
Pressure
gauge
Lo Hi
19
ENGLISH