Appendix
80
Chiller Air-cooled Screw
3. PRELIMINARY EQUIPMENT CHECK
4. Chilled Water System Check
Check
Contents
No
Yes
Drain pipe is not clogged.
No
Yes
Inlet piping to cooler includes strainer.
No
Yes
Chilled water flow switch is operational.
No
Yes
Chilled water pump starter interlocked with chiller.
No
Yes
Chilled water pump is operating with the correct rotation.
No
Yes
All air has been purged from the system.
No
Yes
There is no leakage.
No
No
Yes
All piping is connected properly.
Yes
All chilled water valves are open.
Check
Contents
Is there any physical damage?
Yes
No
ơ
If yes, where?
Will this prevent start-up.
Yes
No
All screws and bolts are tight.
Yes
No
Power supply agrees with the unit nameplate.
Yes
No
Electrical power wiring is installed properly.
Yes
No
Unit is properly grounded.
Yes
No
Electrical circuit protection has been sized and installed properly.
Yes
No
All terminals are tight.
Yes
No
All plug assemblies are tight.
Yes
No
Oil heaters energized for 8 hours before start-up.
Yes
No
Relief valve vents piping per local codes.
Yes
No