Installation
39
39
9.2 Control Box and Wiring Location
- Unscrew all the screw, pull out the panel.
- Connect the transmission wire between outside unit and indoor unit,
the connection between outside unit and central controller system
pass through the sub PCB for central control.
- When connecting indoor unit with the shield cable, ground at the
grounding screw.
When connecting central controller with the shield cable, ground at
the grounding screw.
- Refer to next page about the distance between main power cable
and communication cable.
- Refer to 106 page about Auto-Addressing and Test Run.
Front Panel
Содержание MULTI V WATER II ARWN100LA2
Страница 1: ...0CVT0 03A Replaces 0CVT0 02A R410A 50 60Hz ...
Страница 22: ...Outside Units 10 10 4 Wiring Diagrams ARWN80LA2 ARWN100LA2 ...
Страница 23: ...Outside Units 11 11 ARWN200LA2 ...