Installation
13
13
Slave
Outside Unit
Master
Outside Unit
Slave1
Outside
Unit
Slave2
Outside
Unit
Main
Outside Unit
2 Outside Units
3 Outside Units
1. For the high/low pressure common pipe, connect both master outside unit and slave outside units to the pipe by using
elbows.
2. For cutting the pipe, connect the high/low pressure common pipe after removing burrs, dusts and foreign material within the
pipe. Otherwise, the product may not operate due to sludge within the pipe.
3. For the working part leakage test, apply the nitrogen gas pressure of 3.8MPa (38.7kgf/cm
2
).
4. The vacuum criteria is to maintain the vacuum level to less than 5 Torr 1 hour after reaching 5 Torr. (Execute the vacuum
work again when it is below the criteria.)
5. Open the valve with the hexagon wrench.
8) Connection of high/low pressure common pipe
Содержание MULTI V WATER II ARWN100LA2
Страница 1: ...0CVT0 03A Replaces 0CVT0 02A R410A 50 60Hz ...
Страница 22: ...Outside Units 10 10 4 Wiring Diagrams ARWN80LA2 ARWN100LA2 ...
Страница 23: ...Outside Units 11 11 ARWN200LA2 ...