Installation
32
32
To Outside Unit
Sealed Piping
A
A
B
A
B
ARBLN01621
ARBLN03321
ARBL054
ARBL057
ARBL1010
ARBLN07121
ARBLN14521
ARBL104
ARBL107
ARBL2010
Y branch
Header
4 branch
7 branch
10 branch
0.99
22.2
1.1
31.8
1.21
34.9
1.35
38.1
1.43
41.3
0.99
28.58
0.99
25.4
0.99
19.05
0.99
15.88
0.8
12.7
0.8
9.52
0.8
6.35
Minimum
thickness [mm]
Outer diameter
[mm]
7.7 Refrigerant pipe fitting
7.7.1 Caution
1. Use the following materials for refrigerant piping.
• Material: Seamless phosphorous deoxidized copper pipe
• Wall thickness : Comply with the relevant local and national regulations for the designed pressure
3.8MPa. We recommend the following table as the minimum wall thickness.
2. Commercially available piping often contains dust and other materials. Always blow it clean with a dry inert gas.
3. Use care to prevent dust, water or other contaminants from entering the piping during installation.
4. Reduce the number of bending portions as much as possible, and make bending radius as big as possible.
5. Always use the branch piping set shown below, which are sold separately.
6. If the diameters of the branch piping of the designated refrigerant piping differs, use a pipe cutter to cut the connecting sec-
tion and then use an adapter for connecting different diameters to connect the piping.
7. Always observe the restrictions on the refrigerant piping (such as rated length, difference in height, and piping diameter).
Failure to do so can result in equipment failure or a decline in heating/cooling performance.
8. A second branch cannot be made after a header. (These are shown by .)
9. The system will stop due to an abnormality like excessive or insufficient refrigerant. At such a time, always properly charge
the unit. When servicing, always check the notes concerning both the piping length and the amount of additional refrigerant.
10. Never perform a pump down. This will not only damage the compressor but also deteriorate the performance.
11. Never use refrigerant to perform an air purge. Always evacuate using a vacuum pump.
12. Always insulate the piping properly. Insufficient insulation will result in a decline in heating/cooling performance, drip of con-
densate and other such problems.
13. When connecting the refrigerant piping, make sure the service valves of the outside unit is completely closed (the factory
setting) and do not operate it until the refrigerant piping for the outside and indoor units has been connected, a refrigerant
leakage test has been performed and the evacuation process has been completed.
14. Always use a non-oxidizing brazing material for brazing the parts and do not use flux. If not, oxidized film can cause clog-
ging or damage to the compressors and flux can harm the copper piping or refrigerant oil.
Содержание MULTI V WATER II ARWN100LA2
Страница 1: ...0CVT0 03A Replaces 0CVT0 02A R410A 50 60Hz ...
Страница 22: ...Outside Units 10 10 4 Wiring Diagrams ARWN80LA2 ARWN100LA2 ...
Страница 23: ...Outside Units 11 11 ARWN200LA2 ...