COMPONENTS
TEST PROCEDURE
RESULTS
5-10
RELAY 2
FAN MOTOR
(Wire leads removed)
TURNTABLE
MOTOR
(Wire leads removed)
Check for continuity of relay 2 with an
ohm-meter.
(Remove wire leads from relay 2 and
operate the unit.)
Measure the resistance.
(Ohm-meter scale: R x 100)
Measure the resistance.
(Ohm-meter scale: R x 1000)
POWER
LEVEL
20%
6 sec
16 sec
40%
10 sec
12 sec
60%
14 sec
8 sec
80%
18 sec
4 sec
100%
22 sec
0 sec
Normal:
A~B : Approx. 65 ~ 80 ohm
B~C : Approx. 10 ~ 30 ohm
A~C : Approx. 85 ~ 105 ohm
Abnormal: Infinite or several
ohm.
Normal: Approx. 2-4 K
Ω
Abnormal:
∞
or several
Ω
NOTE : • A MICROWAVE LEAKAGE TEST MUST ALWAYS BE PERFORMED WHEN THE UNIT IS
SERVICED FOR ANY REASON.
• MAKE SURE THE WIRE LEADS ARE IN THE CORRECT POSITION.
• WHEN REMOVING THE WIRE LEADS FROM THE PARTS, BE SURE TO GRASP THE
CONNECTOR, NOT THE WIRES.
Relay 1
Relay 2
Power
Transformer
A(RD)
B(BK)
C(WH)
Содержание MS-74ML
Страница 28: ...6 2 14970A 14026A 13552A 13536A 13213A 13720D 13352A 13581A DOOR PARTS EV ...
Страница 29: ...6 3 WTP018 26638A 23572A 23550D 24930D 24781M 268711 CONTROL PANEL PARTS EV ...
Страница 30: ...6 4 33112U WTT021 36549S WTP013 33052M 33390G 35889A OVEN CAVITY PARTS EV ...
Страница 31: ...6 5 43501A 43500A 466001 WSZ085 466003 466002 44510A LATCH BOARD PARTS EV ...
Страница 33: ...6 7 BASE PLATE PARTS 63303A 63302A WTT021 65006B 65006B WSZ002 56851D 54810C 50CZZH 56170D WSZ002 EV ...
Страница 34: ...8 1 SCHEMATIC DIAGRAM OF P C B ...
Страница 35: ...8 2 PRINTED CIRCUIT BOARD ...
Страница 36: ......