- 22 -
Copyright ©2008 LG Electronics. Inc. All right reserved.
Only for training and service purposes
LGE Internal Use Only
• Drill the piping hole with 70mm dia, hole core drill.
• Piping hole should be slightly slant to the outdoor
side.
INSULATION, OTHERS
Insulate the joint and tubes completely.
All thermal insulation must comply with local requirement.
REFRIGERANT PIPE
• Insulate and tape both the gas piping and
liquid piping.
■
After all workings are finished, check the working and operation.
• Air distribution ...............Is the air circulation good?
• Drain .............................Is the drainage smoothly and no sweating?
• Gas leakage .................Is the piping connection correctly?
• Wiring ...........................Is the wiring connection correctly?
• Lock-bolt........................Is the lock-bolt of compressor loosened?
THERMAL INSULATION
TEST AND CHECK
5~7mm
Indoor
Outdoor
WALL
Power cable
Liquid pipe
Thermal insulator
Gas pipe
Tape
Содержание LV-C362FLA0
Страница 49: ...P NO 3828A20172X February 2008 ...