INSTALLATION OF UNIT
15
ENGLISH
Field Wiring
5 / 6 / 7.6 / 8.3 RT 380~415 V3N~50 Hz
Switch
ELCB
• Unit ground Lines are required for preventing electrical shock accident during current leak-
age,
Communication disorder by noise effect and motor current leakage (without connection to
pipe).
• Install the main switch that can interrupt all the power sources in an integrated manner be-
cause this system consists of the equipment utilizing the multiple power sources.
• If there exists the possibility of reversed phase, lose phase, momentary blackout or the
power goes on and off while the product is operating, attach a reversed phase protection cir-
cuit locally.
Running the product in reversed phase may break the compressor and other parts.
CAUTION
!
Содержание LK-C0608A
Страница 17: ...September 2016 ...