Due to our policy of continuous product innovation, some specifications may change without notification.
©
LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. “LG” is a registered trademark of LG Corp.
64 | duct (HIgH StatIc)
Ceiling-Concealed Duct (High Static) System Engineering Manual
LUU367HV Outdoor Unit Connections
1. Remove the side panel.
2. Use the clamp to attach the wiring / cable.
Figure 61: Detailed Power / Communications System Schematic.
eleCtriCal ConneCtionS
•
Use only copper wiring that is strand-
ed, shielded with the wires separately
insulated.
•
Power wiring and communications
cable sizes must comply with applica-
ble federal UL / ETL, state, and local
codes.
•
Install a ground wire for the outdoor
unit and indoor unit.
•
Verify all wiring / cable connections are
appropriately tightened.
L
L
N
N
G
Power Supply
Main Switch
Circuit Breaker
Fuse
Power Wiring
(Including Ground)
Outdoor Unit
1(L1) 2(L2)
Terminal Block Outdoor
1(L1) 2(L2) 3
Terminal Block Outdoor
Communication
Cable
1(L1) 2(L2)
Terminal Block Indoor
3
Indoor Unit
Power
Wiring
Connecting the Power Wiring / Communications Cable to the outdoor unit
LUU247HV Outdoor Unit Connections
1. Remove the control cover from the unit by loosening the screws.
2. Take off the caps on the conduit panel.
3. Connect both the power supply and low voltage lines to the corre-
sponding terminals on the terminal block.
4. Be sure to ground the unit by following local codes.
5. Allow for enough length (add several inches) for each wiring.
6. Secure the cable with the cord clamp.
7. Secure conduit tubes with lock nuts.
8. Reattach the control cover with screws.
Figure 62: LUU247HV Outdoor Unit Terminal Block Location.
Outdoor Unit Electrical Connection
Terminal block
Over 0.2”
Control cover
Conduit panel
Connecting
cable
Power supply
cord
*Connection might look slightly different depending on Single
Zone ODU being used.
Figure 63: LUU367HV Outdoor Unit Terminal Block
Location.
When connecting the power wiring /
communication cables, make sure
the rubber bushing is properly inserted
in the access holes after removing the insulation.
Insulation
Main
Terminal
Block
Clamps
Clamp
Wiring connections
Содержание LH247HV
Страница 29: ... Cooling Capacity Data on page 30 Heating Capacity Data on page 32 PERFORMANCE DATA ...
Страница 69: ......
Страница 70: ......
Страница 71: ......