>> Piping Routine
1.Wr
ap
th
ec
on
ne
cti
ng
po
rti
on
of
in
do
or
un
it
wit
ht
he
In
su
la
tio
nm
ate
ria
la
nd
secureit
withtw
oPlastic
Bands.(f
orthe
rightpipings)
•
Ify
ouw
antto
connectan
additionaldr
ain
hose,
theend
ofthe
drain-outlet
should
keep
distancefrom
theg
round.(Do
not
dipit
intow
ater ,and
fixit
onthe
wall
to
avoid
swinging
inthe
wind.)
2.T
ap
e
th
e
Pip
in
gs
,
dr
ain
ho
se
an
d
ConnectingCab
lefr
ombottom
totop.
3.F
orm
th
ep
ip
in
gs
ga
th
ere
db
yt
ap
in
g
alongthe
exterior
walland
fixit
ontothe
wallb
ysad
dleor
equivalent.
2.T
apethe
Pipingsand
Connectingcab
le
from
bottomto
top.
3.F
orm
th
ep
ip
in
gs
ga
th
ere
db
yt
ap
in
g
alo
ng
th
ee
xte
rio
rw
all
,a
nd
ma
ke
th
e
trappre
ventwater
from
enteringinto
the
room.
4.Fix
thepipings
ontothe
wallb
ysad
dle
orequiv
alent.
20
Incase
ofthe
Outdoorunit
beinginstalled
below
positionof
theIndoor
unit.
Incase
ofthe
OutdoorUnit
beinginstalled
above
positiono
fthe
IndoorUnit.
T rap is required to pre
vent w
ater from entering
into electrical par
ts.
Seal a small opening
around the pipings
with gum type sealer.
Drain hose
T aping
Pipings
Connecting
cable
Pow
er supply
cord
Seal a small opening
around the pipings
with gum type sealer.
T rap
Содержание JBNQ18GB2A1
Страница 8: ...Cooling Mode 8 ...
Страница 9: ...Auto Operation Mode 9 ...
Страница 10: ...Dehumidification Mode 10 ...
Страница 12: ...Temperature Setting Room Temperature Checking 12 ...
Страница 13: ...Timer 13 ...
Страница 17: ...Self diagnosis Function 17 ...
Страница 20: ...Wide LCD Wired Remote Controller Optional 20 ...
Страница 21: ......
Страница 22: ...27 Installer Setting Setting Address of Central Control ...
Страница 24: ...Installer Setting How to enter installer setting mode 25 ...