23
Connecting Cables between Indoor and Outdoor Unit
1) Connecting cables to the Indoor Unit
Connect the wires to the terminals on the control board individually according to the
outdoor unit connection.
Ensure that the color of the wires of outdoor unit and the terminal No. are the same as
those of indoor unit respectively
2) Clamping of cables
1) Arrange 2 power cables on the control panel.
2) First, fasten the steel clamp with a screw to the inner boss of control panel.
3) For the cooling model, fix the other side of the clamp with a screw strongly.
The power cord
connected to the outdoor unit should be
with the following specifications
If the supply cord is damaged, it must be replaced by a special cord or assembly availible from the manufacturer of its service agent.
The connecting cable
connected to the indoor and outdoor
unit should be with the following specifications
CAUTION
20mm
GN/YL
NORMAL
CROSS-SECTIONAL
AREA
1.25mm
2
(36/48K)
20mm
GND
Capacity
36/48 K BTU/h
1 Phase
2.5mm
2
NORMAL CROSS-SECTIONAL AREA
Make sure that the screws of the terminal are free from looseness.
WARNING
36/48K BTU/h
Applied Model:- LMA36B2ALI, LMA48B2ALI
1) Input 1-phase power supply into outdoor & wire specification.
2) For connection between of Indoor and Outdoor unit & wire specification
Indoor terminal block
1
2
3
1
2
3
Outdoor terminal block
RD BK
BR
Wire specification.
Model
Capacity
1 Phase
No of core
LMA36B2ALI
1.5 TR x 2
1.5 mm2
4
LMA48B2ALI
2 TR x 2
1.5 mm2
4
Note : GND = Ground Earthing
A) LMA36B2ALI
2
1
N
L GND
Outdoor terminal block
Wire specification.
Model
Capacity
1 Phase
mm2 * core
LMA36B2ALI
1.5TR x 2
2.5 mm2*3
LMA48B2ALI
2TR x 2
2.5 mm2*3
2
1
N
L
GND
Unit-1
Unit-2
10
11
L
N GND
3
2
GND
N
L
Unit-1
Unit-2
1
12
GND
1
2
3
3
4
5
6
B) LMA48B2ALI
GND
1
2
3
9
10
11
12
GND
Unit-1
Unit-1
1
2
3
4
5
6
BR
BK
RD
GND
Unit-2
Unit-2
Unit-1
Unit-2
Unit-1
Unit-2
A) LMA36B2ALI
B) LMA48B2ALI
RD
BK
BR
RD
BK
BR
Содержание JB-B2156QC
Страница 29: ...B Remote Control Preparation 29 ...
Страница 40: ......