- 44 -
1. Form the piping according to its routing. Avoid
bending and bending back the same piping point
more than three times. (This will result in hard-
ening the pipe.)
2. After deforming the piping, align centers of the
union fitting of the indoor unit and the piping, and
tighten them firmly with wrenches.
3. Connect pipe to the service valve or ball valve
which is located below the outdoor unit.
4. After completing the piping connection, be sure
to check if there is gas leakage in indoor and
outdoor connection.
After completing the piping connection, execute
vacuum drying for the connecting piping and the
indoor unit.
The vacuum drying must be carried out using the
service ports of both the liquid and gas side valves.
Use two wrenches and tighten with regular torque.
Outdoor
unit
Liquid side
Flare connection
Flare connection
Gas side
Indoor
unit
Union
Piping Connection
Vacuum drying
CAUTION
Flare nut fastening torque
Ø6.35mm(1/4")
1.8kg.mm
Ø9.52mm(3/8")
4.0kg.mm
Ø12.7mm(1/2")
5.5kg.mm
Ø15.88mm(5/8")
6.6kg.mm
Содержание HPCI-C35E
Страница 110: ... 110 Electronic Control Device 1 Room Type Indoor Unit MAIN P C B DC ASM MAIN P C B AC ASM ...
Страница 111: ... 111 2 Cassette Type Indoor Unit MAIN P C B DC ASM ...
Страница 112: ... 112 3 Convertible Type Indoor Unit ...
Страница 113: ...4 Duct Type Indoor Unit 9 12k 113 ...
Страница 114: ... 114 18k ...
Страница 115: ... 115 5 Display ASSY Room Type Indoor Unit Convertible Type Indoor Unit ...
Страница 116: ... 116 6 Outdoor Unit MAIN P C B ASM V P U N W ...
Страница 117: ... 117 Schematic Diagram 1 Room Type Indoor Unit ...
Страница 119: ... 119 3 Convertible Type Indoor Unit RY 4WAY RY OUTFAN ...
Страница 126: ... 126 354212 249951 268714 266012 352114 263230 352118 330870 158591 3 Cassette Type Indoor Unit 12K 18K Btu Models ...
Страница 127: ... 127 346810 130411 359011 152312 135802 135312 2 W0CZZ 137211 267110 352150 352150 130911 268712 146811 ...
Страница 139: ...P No 3828A20097S February 2004 Printed in Korea ...