![LG GC-B197HWL Скачать руководство пользователя страница 6](http://html.mh-extra.com/html/lg/gc-b197hwl/gc-b197hwl_service-manual_218784006.webp)
Fuse Inspection
- Visually inspect for fuse broken.
- When a fuse is destroyed, visually inspect for breaking of IPM and IC209 and additionally check it with a multi-test.
Inverter Parts Inspection
- Visually inspect for breaking of IPM and IC209 and additionally check it with a multi-test (check for short).
Bridge Diode Inspection
- Bridge diode is considered as destroyed if value of10W or less is shown in every case when measuring resistance with a multi-test
for 2 terminals of
4 diode terminals.
※
Power should be turned on again after checking all parts because series of detects may occur when powering on in a simple parts
defect status for parts defect related with an inverter.
COMPRESSOR
-6-
Содержание GC-B197HWL
Страница 13: ...2 8 Failure Checking Procedures Heavy Repair Method of Refrigerator by Application of Refrigerant 13 ...
Страница 15: ...PARTS IDENTIFICATION 15 Frame Display Cover PWB o N f e R 2 ...
Страница 30: ... 30 3 PWB Parts Drawings and List 3 1 PWB Assembly Main Parts Drawings EXPLATION FOR MICOM CIRCUIT ...
Страница 31: ... 31 EXPLATION FOR MICOM CIRCUIT ...
Страница 32: ...CIRCUIT 32 ...
Страница 52: ...Attachments Resistance of Sensor Temp F Sensor Resistance R1 R2 D RT Sensor Resistance 52 ...
Страница 94: ...EXPLODED VIEW 210B 210B 210B 210C 210C 202A 205F 201A 203A 207A 207A 501A 207A 279B 207A 279A 200A 94 ...
Страница 95: ...EXPLODED VIEW 230A 233A 231A 234A 212G 147A 243E 241A 241C 241B 240B 240B 240D 240C 232A 205F 95 ...
Страница 99: ......