23
Battery Pack Installation
8. To secure the battery pack to the wall, replace
the top cover and tighten the screws to a torque
of 2.75 N·m.
4.5 Installation clearance
Make sure to leave a space of at least 9 mm between the battery pack and the wall.
A clearance of at least 9 mm must be left around the battery pack for proper cooling.
NOTE
Make sure that the battery pack is always exposed to the ambient air. The battery pack
is cooled by natural convection. If the battery pack is entirely or partially covered or
shielded, it may cause the battery pack to stop operating.
Содержание EH048252P3S1
Страница 49: ......