![LG ED05K000E00 Скачать руководство пользователя страница 46](http://html.mh-extra.com/html/lg/ed05k000e00/ed05k000e00_installation-manual_18259046.webp)
46
Appendix
5
Appendix
C
Turn off the AC circuit breaker in the distribution box.
And wait at least 10-minute standby period of time to complete discharging this product.
D
Disassemble the lower cover from the product.
E
Disconnect the Ethernet, smart meter, BMS cables from the product.
F
Disconnect the PV1 and PV2 connector from the product.
G
Disconnect the battery DC cables from the product. Use the appropriate size of a lat-head
screwdriver when disconnecting.
H
Disconnect the AC and grounding cable from the product. Use the appropriate size of a screwdriver
when disconnecting.
I
Assemble the lower cover to the product.
And then ix the screws in numbering order.
J
Remove the screws from the lower wall bracket.
K
Remove the product from the wall. Make sure that
at least two persons work together to move the
product.