24
INSTALLATION
3
Install UL-listed strain relief into the power
cord through-hole.
4
Thread the 4-wire #10 AWG minimum copper
power cable prepared in step 1 through the
strain relief.
a
Terminal Block
b
UL-Listed Strain Relief
c
UL-Listed 4-Wire Power Cord
5
Transfer the appliance's ground wire from
behind the green ground screw to the center
of the terminal block.
6
Attach the two hot leads (black and red) of the
power cord to the outer terminal block
screws.
7
Attach the neutral (white) wire to the center
screw of the terminal block.
8
Attach the power cord ground wire to the
green ground screw.
9
Tighten all screws securely.
10
Reinstall the terminal block access cover.
a
White Wire moved from Ground Screw
b
Hot Leads of Power Cord (Black and Red)
c
Neutral Wire (White)
d
Power Cord Ground Wire
e
Ground Screw
Three-Wire Power Cord
1
Remove the terminal block access cover on
the upper back of the appliance.
2
Install the UL-listed strain relief into the
power cord through-hole.
3
Thread a 30-amp, 240 volt, 3-wire, UL-listed
power cord with #10 AWG-minimum copper
conductor through the strain relief.
a
Terminal Block
b
UL-Listed Strain Relief
c
UL-Listed 3-Wire Power Cord
4
Attach the two hot leads (black and red) of the
power cord to the outer terminal block
screws.
5
Attach the neutral (white) wire to the center
terminal block screw.
6
Connect the external ground (if required by
local codes) to the green ground screw.
7
Tighten all screws securely.
a
b
c
a
b
b
c
d
e
• A 3-wire connection is NOT
permitted on new construction after
January 1, 1996.
• A UL-listed strain relief is required.
• Use a 30-amp, 240-volt, 3-wire, UL-listed
power cord with #10 AWG-minimum copper
conductor and closed loop or forked terminals
with upturned ends.
Содержание DL X670 Series
Страница 32: ...32 OPERATION Low No Heat Air Heat Setting Label Directions ...
Страница 61: ...61 Memo ...
Страница 62: ...62 Memo ...
Страница 63: ...63 Memo ...