2-7
3) Set the Gear Loading 1 and Gear Pulley 2 on the
Base Main.
Hang the belt between the Gear Pulley and Motor Pul-
ley.
Assemble the Clamp Disc, Clamp Magnet and Cover
Plate to the Base Main.
4) After setting the Gear Main 2, Gear Pu Up 3 and Gear
Pu Down 4 on the Base Main, tighten the screws.
After assembling the Gear Main, align the location as
shown in Figure.
ORDER OF ASSEMBLY FOR MECHANISM DECK
1
2
Figure 3
Figure 4
2
3
4
1
Содержание CM9520
Страница 27: ...A60L A60R 4 SPEAKER SECTION 4 1 FRONT SPEAKER CMS9520F ...
Страница 28: ...A80L A80R 4 2 REAR SPEAKER CMS9520S ...
Страница 29: ...A90 4 3 PASSIVE SUBWOOFER CMS9520W ...
Страница 81: ...3 52 9 VFD GRID CURRENT DRIVER Figure 9 joXayZY O wZW P joYaxZWXG l ...
Страница 100: ...3 89 3 90 PRINTED CIRCUIT BOARD DIAGRAMS 1 SMPS P C BOARD TOP VIEW ...
Страница 102: ...3 93 3 94 2 MAIN P C BOARD TOP VIEW ...
Страница 103: ...3 95 3 96 MAIN P C BOARD BOTTOM VIEW ...
Страница 104: ...3 97 3 98 3 FRONT_VFD P C BOARD TOP VIEW BOTTOM VIEW ...
Страница 105: ...3 99 3 100 4 FRONT_USB P C BOARD TOP VIEW BOTTOM VIEW 5 FRONT_MIC P C BOARD TOP VIEW BOTTOM VIEW ...
Страница 106: ...3 101 3 102 6 FRONT_VOLUME P C BOARD TOP VIEW ...
Страница 107: ...3 103 3 104 FRONT_VOLUME P C BOARD BOTTOM VIEW ...
Страница 108: ...3 105 3 106 7 IPOD P C BOARD TOP VIEW BOTTOM VIEW ...
Страница 109: ...MEMO MEMO 3 107 3 108 ...