Copyright © 2016 - 2017 LG Electronics Inc. All
rights reserved. Only training and service purposes.
- 96 -
Multi
Tester
- Measure the voltage between the POWER and COMM pins of the connector as shown below.
Check to make sure compressor is receiving voltage from IPM
- In order to determine whether the compressor is operating normally,
check the output voltage during the refrigeration cycle.
- After initial power-up, when the compressor begins to operate, wait 10
minutes before checking.
- The compressor is operating normally if the voltage is greater than 80V.
IPM Output check
Содержание ASBCNA0
Страница 7: ...Copyright 2016 2017 LG Electronics Inc All rights reserved Only training and service purposes 7 ...
Страница 29: ...Copyright 2016 2017 LG Electronics Inc All rights reserved Only training and service purposes 29 ...
Страница 74: ... 74 Copyright 2016 2017 LG Electronics Inc All rights reserved Only training and service purposes ...
Страница 112: ...Copyright 2016 2017 LG Electronics Inc All rights reserved Only training and service purposes 112 ...
Страница 122: ...P No MFL68488649 APR 2017 Printed in Korea ...