Service Manual 19
Installation
Wrap the insulation material around the connect-
ing portion.
1. Overlap the connection pipe heat insulation and the
indoor unit pipe heat insulation material. Bind them
together with vinyl tape so that there may be no
gap.
2. Wrap the area which accommodates the rear piping
housing section with vinyl tape.
3. Bundle the piping and drain hose together by wrap-
ping them with cloth tape over the range within
which they fit into the rear piping housing section.
Reroute the pipings and the drain hose across the
back of the chassis.
Indoor unit installation
1. Remove the spacer.
2. Ensure that the hooks are properly seated on the
installation plate by moving it left and right.
3. Press the lower left and right sides of the unit
against the installation plate until the hooks engage
into their slots(clicking sound).
Plastic bands
Insulation material
Vinyl tape(narrow)
Connection
pipe
Connecting cable
Indoor
unit piping
Pipe
Vinyl tape
(wide)
Wrap with vinyl tape
Drain hose
Vinyl tape(narrow)
Pipe
Wrap with
vinyl tape(wide)
Piping for
passage through
piping hole
Drain hose
Connecting
cable
Содержание AS-H096UM0
Страница 43: ...Service Manual 43 Schematic Diagram DISPLAY ASSEMBLY ...
Страница 62: ...62 Room Air Conditioner Memo ...
Страница 63: ...P No 3828A20195T Printed in Korea ...