- 21 -
Copyright ©2010 LG Electronics. Inc. All right reserved.
Only for training and service purposes
LGE Internal Use Only
Flaring work and connection of piping
Check
1. Compare the flared work with the figure by.
2. If a flared section is defective, cut it off and do flaring
work again.
Indoor
Preparing the indoor unit's piping and drain hose for installation through the wall.
CAUTION: If the drain hose is routed inside the room, insulate the hose with an
insulation material* so that dripping from "sweating"(condensation) will not
damage furniture or floors.
*Foamed polyethylene or equivalent is recommended.
1. Route the indoor tubing and the drain hose in the
direction of rear left or right
2. Tape the tubing, drain hose and the connecting
cable. Be sure that the drain hose is located at the
lowest side of the bundle. Locating at the upper side
can cause drain pan to overflow inside the unit.
Inclined
Inside is shiny without scratches
Smooth all round
Even length
all round
Surface
damaged
Cracked Uneven
thickness
= Improper flaring =
Connecting the Piping
Drain hose
Connecting
cable
Gas side piping
Liquid side piping
Drain hose
Loop