- 58 -
Copyright ©2010 LG Electronics. Inc. All right reserved.
Only for training and service purposes
LGE Internal Use Only
Troubleshooting Guide
1) Re-air purging
(Re-installation)
• Procedure
(1) Confirm that both the liquid side valve and the
gas side valve are set to the closed position.
(2) Connect the charge set and a gas cylinder to
the service port of the Gas side valve.
– Leave the valve on the gas cylinder closed.
(3) Air purging.
– Open the valves on the gas cylinder and the
charge set. Purge the air by loosening the flare
nut on the liquid side valve approximately 45°
for 3 seconds then closing it for 1 minute;
repeat 3 times.
– After purging the air, use a torque wrench to
tighten the flare nut on liquid side valve.
(4) Check for gas leakage.
– Check the flare connections for gas leakage.
(5) Discharge the refrigerant.
– Close the valve on the gas cylinder and
discharge the refrigerant until the gauge
indicates 3 to 5 kg/cm
2
g.
(6) Disconnect the charge set and the gas
cylinder, and set the Liquid side and Gas side
valves to the open position.
– Be sure to use a hexagonal wrench to operate
the valve stems.
(7) Mount the valve stem nuts and the service
port nut.
– Use torque wrench to tighten the service port
nut to a torque of 1.8 kg.m.
– Be sure to check for gas leakage.
* CAUTION:
Do not leak the gas in the air during Air
Purging.
Lo
Closed
OPEN
Closed
Gas cylinder
Outdoor unit
Indoor unit
Liquid side
Gas side
CLOSE
3-Way
valve
3-Way
valve
Refrigerant